A platform for research: civil engineering, architecture and urbanism
Prefabricated steel structure integrated assembly type green building component
The invention relates to the technical field of building prefabricated components, and discloses a prefabricated steel structure integrated assembly type green building component which comprises a wall body, supporting columns are fixedly connected to the two sides of the wall body correspondingly, dismounting and mounting mechanisms are arranged on the sides, close to each other, of the supporting columns correspondingly, and adjusting mechanisms are arranged in the supporting columns; the dismounting and mounting mechanism comprises swinging arms, rotating blocks, movable columns, clamping blocks, reset springs and mounting blocks, the two swinging arms are rotationally connected through the rotating blocks, the left ends of the swinging arms are rotationally connected with the clamping blocks through the movable columns, and the two clamping blocks are connected through the reset springs. Deformation and looseness caused by temperature difference change can be effectively prevented through the dismounting and mounting mechanism, the stability degree of a component connecting piece is effectively improved, the distance between the bottom plate and the base can be adjusted through the adjusting mechanism, and therefore the height of the wall is adjusted, and the situation that the wall is eroded and damaged by accumulated water when the wall is located at the low position is avoided.
本申请涉及建筑预制构件技术领域,公开了一种预制钢结构一体化装配式绿色建筑构件,包括墙体,所述墙体的两侧均固定连接有支撑柱,所述支撑柱的相靠近一侧均设置有拆装机构,所述支撑柱的内部设置有调节机构;所述拆装机构包括摆动臂、转动块、活动柱、卡块、复位弹簧和安装块,两个所述摆动臂通过转动块转动连接,所述摆动臂的左端通过活动柱转动连接有卡块,两个卡块通过复位弹簧相连接。通过拆装机构能够有效的防止温差变化下导致的形变松动,有效的提高构件连接件的稳定程度,通过设置调节机构可以对底板与底座之间的距离进行调节,从而实现对墙体高度的调节,避免墙体在低处时有积水对其侵蚀损坏。
Prefabricated steel structure integrated assembly type green building component
The invention relates to the technical field of building prefabricated components, and discloses a prefabricated steel structure integrated assembly type green building component which comprises a wall body, supporting columns are fixedly connected to the two sides of the wall body correspondingly, dismounting and mounting mechanisms are arranged on the sides, close to each other, of the supporting columns correspondingly, and adjusting mechanisms are arranged in the supporting columns; the dismounting and mounting mechanism comprises swinging arms, rotating blocks, movable columns, clamping blocks, reset springs and mounting blocks, the two swinging arms are rotationally connected through the rotating blocks, the left ends of the swinging arms are rotationally connected with the clamping blocks through the movable columns, and the two clamping blocks are connected through the reset springs. Deformation and looseness caused by temperature difference change can be effectively prevented through the dismounting and mounting mechanism, the stability degree of a component connecting piece is effectively improved, the distance between the bottom plate and the base can be adjusted through the adjusting mechanism, and therefore the height of the wall is adjusted, and the situation that the wall is eroded and damaged by accumulated water when the wall is located at the low position is avoided.
本申请涉及建筑预制构件技术领域,公开了一种预制钢结构一体化装配式绿色建筑构件,包括墙体,所述墙体的两侧均固定连接有支撑柱,所述支撑柱的相靠近一侧均设置有拆装机构,所述支撑柱的内部设置有调节机构;所述拆装机构包括摆动臂、转动块、活动柱、卡块、复位弹簧和安装块,两个所述摆动臂通过转动块转动连接,所述摆动臂的左端通过活动柱转动连接有卡块,两个卡块通过复位弹簧相连接。通过拆装机构能够有效的防止温差变化下导致的形变松动,有效的提高构件连接件的稳定程度,通过设置调节机构可以对底板与底座之间的距离进行调节,从而实现对墙体高度的调节,避免墙体在低处时有积水对其侵蚀损坏。
Prefabricated steel structure integrated assembly type green building component
一种预制钢结构一体化装配式绿色建筑构件
MA XINGZHENG (author) / NIU QINGSONG (author) / HU ZHANNENG (author) / ZHANG DONG (author) / HE TING (author) / PAN YING (author)
2023-07-25
Patent
Electronic Resource
Chinese
Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2021
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2022
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2022
|Prefabricated steel structure integrated assembly type green building component
European Patent Office | 2020
|Assembly type prefabricated building steel structure beam column connecting component
European Patent Office | 2023
|