A platform for research: civil engineering, architecture and urbanism
Construction method of prefabricated end-bearing pipe pile
The invention mainly relates to the field of engineering, in particular to a construction method of a prefabricated end-bearing pipe pile. The construction method of the prefabricated end-bearing pipe pile mainly solves the problem that the construction quality is difficult to guarantee when a traditional cast-in-place pile is used as a cast-in-place pile, and mainly comprises the following four steps that step 1, hole forming is conducted, a hole is formed to a bearing soil layer by adopting a traditional cast-in-place pile hole forming construction method; step 2, pile sinking is conducted, specifically, before pile sinking, a hollow core of a prefabricated pile is sealed through an end steel cap at the end of the prefabricated pile, and then the prefabricated pile sinks into a designed elevation position according to a designed length and is hung up; step 3, concrete is poured, a grouting pipe is placed in the middle of the pipe pile, and then grouting is conducted; and step 4, remaining gaps in the pile hole are filled. According to the construction method of the prefabricated end-bearing pipe pile, the main stress structure of the structure is a prefabricated part, the construction quality can be well guaranteed, and pile supplementing is avoided.
本发明主要涉及工程领域,是一种预制端承管桩的施工方法,主要解决传统灌注桩作为灌注桩时施工质量难以保障的问题,本施工方法主要分为四个步骤,第一步成孔,采用传统的灌注桩成孔的施工方法成孔至持力土层;第二步沉桩,沉桩前,预制桩端头采用端头钢帽封住预制桩空芯,然后将预制桩按照设计长度沉入设计标高位置并挂起;第三步灌注混凝土,将注浆管从管桩中间放入,然后注浆;第四步填筑桩孔内剩余空隙。这种结构的主要受力结构为预制构件,施工质量可以得到很好的保证,避免补桩。
Construction method of prefabricated end-bearing pipe pile
The invention mainly relates to the field of engineering, in particular to a construction method of a prefabricated end-bearing pipe pile. The construction method of the prefabricated end-bearing pipe pile mainly solves the problem that the construction quality is difficult to guarantee when a traditional cast-in-place pile is used as a cast-in-place pile, and mainly comprises the following four steps that step 1, hole forming is conducted, a hole is formed to a bearing soil layer by adopting a traditional cast-in-place pile hole forming construction method; step 2, pile sinking is conducted, specifically, before pile sinking, a hollow core of a prefabricated pile is sealed through an end steel cap at the end of the prefabricated pile, and then the prefabricated pile sinks into a designed elevation position according to a designed length and is hung up; step 3, concrete is poured, a grouting pipe is placed in the middle of the pipe pile, and then grouting is conducted; and step 4, remaining gaps in the pile hole are filled. According to the construction method of the prefabricated end-bearing pipe pile, the main stress structure of the structure is a prefabricated part, the construction quality can be well guaranteed, and pile supplementing is avoided.
本发明主要涉及工程领域,是一种预制端承管桩的施工方法,主要解决传统灌注桩作为灌注桩时施工质量难以保障的问题,本施工方法主要分为四个步骤,第一步成孔,采用传统的灌注桩成孔的施工方法成孔至持力土层;第二步沉桩,沉桩前,预制桩端头采用端头钢帽封住预制桩空芯,然后将预制桩按照设计长度沉入设计标高位置并挂起;第三步灌注混凝土,将注浆管从管桩中间放入,然后注浆;第四步填筑桩孔内剩余空隙。这种结构的主要受力结构为预制构件,施工质量可以得到很好的保证,避免补桩。
Construction method of prefabricated end-bearing pipe pile
一种预制端承管桩的施工方法
ZHOU YUSHI (author) / XIE XIAODONG (author) / LIU GUOFENG (author) / XIE SHUDONG (author) / ZHAO WEIMING (author) / BAO GUOQIANG (author) / LIU FEI (author)
2021-04-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated pipe pile section bearing capacity enhancing structure and construction method
European Patent Office | 2024
|Connecting structure of prefabricated pipe pile and prefabricated bearing platform
European Patent Office | 2024
|Prefabricated pile and prefabricated column connecting bearing platform construction method
European Patent Office | 2021
|Pile pressing mechanism for PHC prefabricated pipe pile construction
European Patent Office | 2024
|