A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of pipe pile connection, and particularly relates to a tubular pile connecting sleeve structure. The tubular pile connecting sleeve structure comprises an upper steel pipe column and a lower steel pipe column, one end of the lower steel pipe column is pre-buried and fixed to the ground, the other end of the lower steel pipe column is fixedly connected with the upper steel pipe column through a connecting sleeve, the connecting sleeve is slidably connected with a positioning column, the two ends of the positioning column are correspondingly connected with the upper steel pipe column and the lower steel pipe column in a matched mode, and the connecting sleeve is in engaged connection with a sliding ring through a transmission assembly. Multi-layer connection work is carried out by arranging welding, bolt fixing and clamping locking modes on the pipe piles, so that workers perform fixed connection work on the outer layer, the middle layer and the inner layer of the pipe piles in the actual construction operation process, and the connection performance of the pipe piles is effectively improved; and meanwhile, the influence of the environment and weather in the welding process is avoided, the connecting efficiency of the pipe piles is improved, the building construction process is accelerated, and large-scale popularization is facilitated.
本发明属于管桩连接技术领域,尤其是涉及一种管桩连接套结构,包括上侧钢管柱和下侧钢管柱,所述下侧钢管柱的一端和地面进行预埋固定,所述下侧钢管柱的另一端通过连接套和上侧钢管柱固定连接,所述连接套滑动连接有定位柱,所述定位柱的两端分别和上侧钢管柱以及下侧钢管柱配合连接,所述连接套通过传动组件啮合连接有滑环。本发明通过对管桩设置焊接、螺栓固定以及卡位锁死的方式进行多层次的连接工作,使得工作人员在实际施工操作过程中可以对管桩在外、中、内三个层次进行固定连接工作,有效提高管桩的连接性能,同时避免焊接过程中受到环境以及天气的影响,提高管桩的连接效率,加快建筑施工进程,适合范围进行推广。
The invention belongs to the technical field of pipe pile connection, and particularly relates to a tubular pile connecting sleeve structure. The tubular pile connecting sleeve structure comprises an upper steel pipe column and a lower steel pipe column, one end of the lower steel pipe column is pre-buried and fixed to the ground, the other end of the lower steel pipe column is fixedly connected with the upper steel pipe column through a connecting sleeve, the connecting sleeve is slidably connected with a positioning column, the two ends of the positioning column are correspondingly connected with the upper steel pipe column and the lower steel pipe column in a matched mode, and the connecting sleeve is in engaged connection with a sliding ring through a transmission assembly. Multi-layer connection work is carried out by arranging welding, bolt fixing and clamping locking modes on the pipe piles, so that workers perform fixed connection work on the outer layer, the middle layer and the inner layer of the pipe piles in the actual construction operation process, and the connection performance of the pipe piles is effectively improved; and meanwhile, the influence of the environment and weather in the welding process is avoided, the connecting efficiency of the pipe piles is improved, the building construction process is accelerated, and large-scale popularization is facilitated.
本发明属于管桩连接技术领域,尤其是涉及一种管桩连接套结构,包括上侧钢管柱和下侧钢管柱,所述下侧钢管柱的一端和地面进行预埋固定,所述下侧钢管柱的另一端通过连接套和上侧钢管柱固定连接,所述连接套滑动连接有定位柱,所述定位柱的两端分别和上侧钢管柱以及下侧钢管柱配合连接,所述连接套通过传动组件啮合连接有滑环。本发明通过对管桩设置焊接、螺栓固定以及卡位锁死的方式进行多层次的连接工作,使得工作人员在实际施工操作过程中可以对管桩在外、中、内三个层次进行固定连接工作,有效提高管桩的连接性能,同时避免焊接过程中受到环境以及天气的影响,提高管桩的连接效率,加快建筑施工进程,适合范围进行推广。
Tubular pile connecting sleeve structure
一种管桩连接套结构
QIAO XUEFENG (author)
2021-04-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Tubular pile connecting device and tubular pile manufacturing method
European Patent Office | 2020
|