A platform for research: civil engineering, architecture and urbanism
The invention discloses a kerb installation engineering vehicle which comprises a vehicle body, warning lamps, storage boxes, pay-off boxes, a slag removal device, a hydraulic box and a hydraulic mechanical arm. The vehicle body is of a quadrangular rectangular structure, the symmetrical warning lamps are installed at the top end of the vehicle body, and the symmetrical storage boxes are installed on the two sides of the tail of the vehicle body. A pay-off box is installed at the bottom end of the tail of the vehicle body and fixed through bolts, a fixed slag removing device is installed in the middle of the top end of the vehicle body, a hydraulic box is installed on the left side of the slag removing device, and a hydraulic mechanical arm is installed on the right side of the slag removing device and fixedly connected through bolts. According to the engineering vehicle, through reasonable design, the participation degree of constructors in the curb stone installation work can be effectively reduced, the labor intensity can be reduced, and the work efficiency can be improved.
本发明公开了一种路缘石安装工程车,包括车身、警示灯、收纳箱、放线盒、清渣装置、液压箱、液压机械臂,所述车身为四边矩形结构且顶端安装有对称式警示灯,所述车身尾部两侧安装有对称式收纳箱,所述车身尾部底端安装有放线盒且通过螺栓固定,所述车身顶端中部安装有固定式请渣装置,所述清渣装置左侧安装有液压箱,所述清渣装置右侧安装有液压机械臂并通过螺栓固定连接。本发明的工程车通过合理化的设计能够有效地降低路缘石的安装工作中施工人员的参与度且能够降低劳动强度以及提高工作效率。
The invention discloses a kerb installation engineering vehicle which comprises a vehicle body, warning lamps, storage boxes, pay-off boxes, a slag removal device, a hydraulic box and a hydraulic mechanical arm. The vehicle body is of a quadrangular rectangular structure, the symmetrical warning lamps are installed at the top end of the vehicle body, and the symmetrical storage boxes are installed on the two sides of the tail of the vehicle body. A pay-off box is installed at the bottom end of the tail of the vehicle body and fixed through bolts, a fixed slag removing device is installed in the middle of the top end of the vehicle body, a hydraulic box is installed on the left side of the slag removing device, and a hydraulic mechanical arm is installed on the right side of the slag removing device and fixedly connected through bolts. According to the engineering vehicle, through reasonable design, the participation degree of constructors in the curb stone installation work can be effectively reduced, the labor intensity can be reduced, and the work efficiency can be improved.
本发明公开了一种路缘石安装工程车,包括车身、警示灯、收纳箱、放线盒、清渣装置、液压箱、液压机械臂,所述车身为四边矩形结构且顶端安装有对称式警示灯,所述车身尾部两侧安装有对称式收纳箱,所述车身尾部底端安装有放线盒且通过螺栓固定,所述车身顶端中部安装有固定式请渣装置,所述清渣装置左侧安装有液压箱,所述清渣装置右侧安装有液压机械臂并通过螺栓固定连接。本发明的工程车通过合理化的设计能够有效地降低路缘石的安装工作中施工人员的参与度且能够降低劳动强度以及提高工作效率。
Kerb installation engineering vehicle
一种路缘石安装工程车
LIU QINGZHU (author)
2021-04-16
Patent
Electronic Resource
Chinese