A platform for research: civil engineering, architecture and urbanism
Kerb construction and installation equipment
The curb construction and installation equipment comprises a vehicle body, and two rows of curb bodies are arranged on the two sides of the top face of the vehicle body correspondingly; the transmission part is arranged on the top surface of the vehicle body and comprises two pushing mechanisms, the two pushing mechanisms are arranged on the two sides of the vehicle body respectively and correspond to the two rows of kerb bodies respectively, a strip-shaped hole is formed in the top surface of the vehicle body and located between the two rows of kerb bodies, and the two rows of kerb bodies are arranged in the strip-shaped hole. The two sides of an inner cavity of the strip-shaped hole are each provided with a transmission mechanism, and a limiting mechanism is arranged between the two transmission mechanisms. The clamping part is arranged on one side of the top face of the vehicle body and comprises two stand columns, the two stand columns are fixedly connected to the two sides of the top face of the vehicle body respectively, a transverse plate is fixedly connected to the top faces of the two stand columns, a lifting mechanism is arranged on the bottom face of the transverse plate, and a positioning mechanism is arranged at the bottom of the lifting mechanism; and a clamping mechanism is arranged at the bottom of the positioning mechanism.
本发明公开一种路缘石施工安装设备,包括:车体,所述车体顶面两侧分别设置有两排路缘石本体;设置在所述车体顶面的传动部,所述传动部包括两推料机构,两所述推料机构分别设置在所述车体两侧,且两所述推料机构分别与两排所述路缘石本体对应设置,所述车体顶面开设有条形孔,所述条形孔位于两排所述路缘石本体之间,所述条形孔内腔两侧分别设置有一传动机构,两所述传动机构之间设置有限位机构;设置在所述车体顶面一侧的夹取部,所述夹取部包括两立柱,两所述立柱分别固接在所述车体顶面的两侧,两所述立柱的顶面固接有横板,所述横板的底面设置有升降机构,所述升降机构的底部设置有定位机构,所述定位机构的底部设置有夹取机构。
Kerb construction and installation equipment
The curb construction and installation equipment comprises a vehicle body, and two rows of curb bodies are arranged on the two sides of the top face of the vehicle body correspondingly; the transmission part is arranged on the top surface of the vehicle body and comprises two pushing mechanisms, the two pushing mechanisms are arranged on the two sides of the vehicle body respectively and correspond to the two rows of kerb bodies respectively, a strip-shaped hole is formed in the top surface of the vehicle body and located between the two rows of kerb bodies, and the two rows of kerb bodies are arranged in the strip-shaped hole. The two sides of an inner cavity of the strip-shaped hole are each provided with a transmission mechanism, and a limiting mechanism is arranged between the two transmission mechanisms. The clamping part is arranged on one side of the top face of the vehicle body and comprises two stand columns, the two stand columns are fixedly connected to the two sides of the top face of the vehicle body respectively, a transverse plate is fixedly connected to the top faces of the two stand columns, a lifting mechanism is arranged on the bottom face of the transverse plate, and a positioning mechanism is arranged at the bottom of the lifting mechanism; and a clamping mechanism is arranged at the bottom of the positioning mechanism.
本发明公开一种路缘石施工安装设备,包括:车体,所述车体顶面两侧分别设置有两排路缘石本体;设置在所述车体顶面的传动部,所述传动部包括两推料机构,两所述推料机构分别设置在所述车体两侧,且两所述推料机构分别与两排所述路缘石本体对应设置,所述车体顶面开设有条形孔,所述条形孔位于两排所述路缘石本体之间,所述条形孔内腔两侧分别设置有一传动机构,两所述传动机构之间设置有限位机构;设置在所述车体顶面一侧的夹取部,所述夹取部包括两立柱,两所述立柱分别固接在所述车体顶面的两侧,两所述立柱的顶面固接有横板,所述横板的底面设置有升降机构,所述升降机构的底部设置有定位机构,所述定位机构的底部设置有夹取机构。
Kerb construction and installation equipment
一种路缘石施工安装设备
2023-07-28
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE