Drainage ditch construction process and pouring equipment for construction
The invention relates to a drainage ditch construction process and pouring equipment for construction, and relates to the field of drainage ditch construction. The drainage ditch construction process comprises a frame body, a slide carriage, a surrounding frame and two discharging devices, wherein the enclosing frame is arranged on the frame body, the slide carriage is arranged on the inner side of the surrounding frame, the slide carriage is obliquely arranged downwards from the middle to the two sides, the highest edge of the slide carriage is set to be a material receiving edge, the lowest edge of the slide carriage is set to be a discharging edge, a discharging gap is formed between the discharging edge of the slide carriage and the bottom of the surrounding frame, one discharging device is arranged at the discharging gap in a one-to-one correspondence mode, each discharging device comprises two material guiding plates, any one of the guide plates is hinged with the surrounding frame, the other guide plate is hinged with the slide carriage, during operation, after a groove is dug, concrete is poured into the groove through pouring equipment. The drainage ditch construction process has the effect of reducing the waste of concrete.
本申请涉及一种排水沟施工工艺及施工用浇筑设备,涉及排水沟施工的领域,其包括架体、溜板、围框和两个出料装置,所述围框设于所述架体上,所述溜板设于所述围框内侧,所述溜板由中间至两侧倾斜向下设置,设溜板的最高边缘为接料边、最低边缘为出料边,所述溜板的出料边与围框底部之间形成有出料间隙,一个所述出料装置一一对应的设于一个出料间隙处,所述出料装置包括两个导料板,任一所述导料板与围框铰接另一所述导料板与溜板铰接;作业时,将沟槽挖设完成后,用浇筑设备向沟槽内浇筑混凝土。本申请具有减少混凝土的浪费的效果。
Drainage ditch construction process and pouring equipment for construction
The invention relates to a drainage ditch construction process and pouring equipment for construction, and relates to the field of drainage ditch construction. The drainage ditch construction process comprises a frame body, a slide carriage, a surrounding frame and two discharging devices, wherein the enclosing frame is arranged on the frame body, the slide carriage is arranged on the inner side of the surrounding frame, the slide carriage is obliquely arranged downwards from the middle to the two sides, the highest edge of the slide carriage is set to be a material receiving edge, the lowest edge of the slide carriage is set to be a discharging edge, a discharging gap is formed between the discharging edge of the slide carriage and the bottom of the surrounding frame, one discharging device is arranged at the discharging gap in a one-to-one correspondence mode, each discharging device comprises two material guiding plates, any one of the guide plates is hinged with the surrounding frame, the other guide plate is hinged with the slide carriage, during operation, after a groove is dug, concrete is poured into the groove through pouring equipment. The drainage ditch construction process has the effect of reducing the waste of concrete.
本申请涉及一种排水沟施工工艺及施工用浇筑设备,涉及排水沟施工的领域,其包括架体、溜板、围框和两个出料装置,所述围框设于所述架体上,所述溜板设于所述围框内侧,所述溜板由中间至两侧倾斜向下设置,设溜板的最高边缘为接料边、最低边缘为出料边,所述溜板的出料边与围框底部之间形成有出料间隙,一个所述出料装置一一对应的设于一个出料间隙处,所述出料装置包括两个导料板,任一所述导料板与围框铰接另一所述导料板与溜板铰接;作业时,将沟槽挖设完成后,用浇筑设备向沟槽内浇筑混凝土。本申请具有减少混凝土的浪费的效果。
Drainage ditch construction process and pouring equipment for construction
一种排水沟施工工艺及施工用浇筑设备
ZHANG HAILIANG (author) / ZHANG FENGCHAO (author) / YANG DONGLEI (author) / YANG ZHIMING (author) / ZHANG WEI (author) / ZHANG MING (author) / ZENG TING (author) / FENG XIAOPENG (author)
2021-04-20
Patent
Electronic Resource
Chinese
Integral formwork for road and bridge drainage ditch construction concrete pouring
European Patent Office | 2015
|European Patent Office | 2020
|Roadside ditch crack pouring device for building construction
European Patent Office | 2021
|