A platform for research: civil engineering, architecture and urbanism
Bridge support deviation rectifying method
The invention discloses a bridge support deviation rectifying method, which comprises a deviation rectifying device, the deviation rectifying device comprises a base, a first groove body mechanism is arranged on the side wall of one side of the base, a lifting mechanism is arranged in the first groove body mechanism, a second groove body mechanism is arranged on the first groove body mechanism, and a second groove body mechanism is arranged on the second groove body mechanism. A first transmission mechanism is installed at the top end of the second groove body mechanism, and a second transmission mechanism is installed on the groove wall of one side of the second groove body mechanism.The method has the beneficial effects that the jack can be used for better jacking a bridge at a weathered and inclined pier part; and therefore, related personnel can correct the support more conveniently, and the problems are solved that due to the fact that the angle of a jack cannot be adjusted in the mode that a common jack corrects the bridge support, the jack is inconvenient to place at a weathered and inclined pier part and jacks a bridge, and related personnel can more conveniently correct the deviation of the support and the like.
本发明公开了一种基于桥梁支座纠偏的方法,包括纠偏装置,所述纠偏装置包括底座,所述底座一侧的侧壁上开设有一个第一槽体机构,所述第一槽体机构内安装有一个抬升机构,所述第一槽体机构上开设有一个第二槽体机构,所述第二槽体机构的顶端安装有一个第一传动机构,所述第二槽体机构一侧的槽壁上安装有一个第二传动机构,本发明所达到的有益效果是:该千斤顶可以在风化倾斜的墩部也能更好的对桥梁进行顶升,从而可以更加便于相关人员对支座进行纠偏,有效的解决了一般千斤顶对桥梁支座进行纠偏的方式,由于不能对千斤顶的角度进行调整,因此不便于使千斤顶放置在风化倾斜的墩部并对桥梁进行顶升,从而能更加便于相关人员对支座进行纠偏等问题。
Bridge support deviation rectifying method
The invention discloses a bridge support deviation rectifying method, which comprises a deviation rectifying device, the deviation rectifying device comprises a base, a first groove body mechanism is arranged on the side wall of one side of the base, a lifting mechanism is arranged in the first groove body mechanism, a second groove body mechanism is arranged on the first groove body mechanism, and a second groove body mechanism is arranged on the second groove body mechanism. A first transmission mechanism is installed at the top end of the second groove body mechanism, and a second transmission mechanism is installed on the groove wall of one side of the second groove body mechanism.The method has the beneficial effects that the jack can be used for better jacking a bridge at a weathered and inclined pier part; and therefore, related personnel can correct the support more conveniently, and the problems are solved that due to the fact that the angle of a jack cannot be adjusted in the mode that a common jack corrects the bridge support, the jack is inconvenient to place at a weathered and inclined pier part and jacks a bridge, and related personnel can more conveniently correct the deviation of the support and the like.
本发明公开了一种基于桥梁支座纠偏的方法,包括纠偏装置,所述纠偏装置包括底座,所述底座一侧的侧壁上开设有一个第一槽体机构,所述第一槽体机构内安装有一个抬升机构,所述第一槽体机构上开设有一个第二槽体机构,所述第二槽体机构的顶端安装有一个第一传动机构,所述第二槽体机构一侧的槽壁上安装有一个第二传动机构,本发明所达到的有益效果是:该千斤顶可以在风化倾斜的墩部也能更好的对桥梁进行顶升,从而可以更加便于相关人员对支座进行纠偏,有效的解决了一般千斤顶对桥梁支座进行纠偏的方式,由于不能对千斤顶的角度进行调整,因此不便于使千斤顶放置在风化倾斜的墩部并对桥梁进行顶升,从而能更加便于相关人员对支座进行纠偏等问题。
Bridge support deviation rectifying method
一种基于桥梁支座纠偏的方法
SONG ZHENHUI (author) / SONG ZHENWANG (author) / ZHOU WEI (author) / JU PENGFEI (author) / CHEN JUN (author) / XIONG ZHIGANG (author) / SONG ZHENHAO (author) / YU PENG (author) / HUANG GEYIN (author)
2021-04-23
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge pier column deviation rectifying device and deviation rectifying method
European Patent Office | 2023
|European Patent Office | 2020
|European Patent Office | 2023
|Building deviation rectifying structure and deviation rectifying method
European Patent Office | 2021
|