A platform for research: civil engineering, architecture and urbanism
Assembled handrail and manufacturing and assembling process thereof
The invention discloses an assembled handrail and a manufacturing and assembling process thereof, and relates to the technical field of handrails. The assembled handrail comprises a first vertical pipe, an upper transverse pipe with a first sleeve and a lower transverse pipe with a second sleeve, the top end of the first vertical pipe is connected with the upper transverse pipe through the first sleeve, and the bottom end of the first vertical pipe is connected with the lower transverse pipe through the second sleeve. The first sleeve and the second sleeve are correspondingly arranged on the upper transverse pipe and the lower transverse pipe, so that the two ends of the first vertical pipe are correspondingly inserted into the first sleeve and the second sleeve to achieve connection of the transverse pipes and the vertical pipes, the welding method of the transverse pipes and the vertical pipes in the prior art is abandoned, and connection of the transverse pipes and the vertical pipes is more convenient and faster; and when the handrail is abandoned, the handrail does not need to be cut and can be quickly disassembled, and the pipe fittings can be reused.
本发明公开一种组装式栏杆及其制作组装工艺,涉及栏杆技术领域,包括第一竖管、具有第一套管的上横管以及具有第二套管的下横管,所述第一竖管的顶端通过所述第一套管与所述上横管连接,底端通过所述第二套管与所述下横管连接;本发明通过在上横管、下横管上分别设置第一套管与第二套管,使得第一竖管能够将两端分别插接在第一套管与第二套管中实现横管与竖管的连接,舍弃了现有技术中横管与竖管焊接的手法,使得二者连接更加方便、快捷;当栏杆废弃时,不必进行切割,能够快速拆卸,并对管件实现重复利用。
Assembled handrail and manufacturing and assembling process thereof
The invention discloses an assembled handrail and a manufacturing and assembling process thereof, and relates to the technical field of handrails. The assembled handrail comprises a first vertical pipe, an upper transverse pipe with a first sleeve and a lower transverse pipe with a second sleeve, the top end of the first vertical pipe is connected with the upper transverse pipe through the first sleeve, and the bottom end of the first vertical pipe is connected with the lower transverse pipe through the second sleeve. The first sleeve and the second sleeve are correspondingly arranged on the upper transverse pipe and the lower transverse pipe, so that the two ends of the first vertical pipe are correspondingly inserted into the first sleeve and the second sleeve to achieve connection of the transverse pipes and the vertical pipes, the welding method of the transverse pipes and the vertical pipes in the prior art is abandoned, and connection of the transverse pipes and the vertical pipes is more convenient and faster; and when the handrail is abandoned, the handrail does not need to be cut and can be quickly disassembled, and the pipe fittings can be reused.
本发明公开一种组装式栏杆及其制作组装工艺,涉及栏杆技术领域,包括第一竖管、具有第一套管的上横管以及具有第二套管的下横管,所述第一竖管的顶端通过所述第一套管与所述上横管连接,底端通过所述第二套管与所述下横管连接;本发明通过在上横管、下横管上分别设置第一套管与第二套管,使得第一竖管能够将两端分别插接在第一套管与第二套管中实现横管与竖管的连接,舍弃了现有技术中横管与竖管焊接的手法,使得二者连接更加方便、快捷;当栏杆废弃时,不必进行切割,能够快速拆卸,并对管件实现重复利用。
Assembled handrail and manufacturing and assembling process thereof
一种组装式栏杆及其制作组装工艺
MO YONGLUN (author)
2021-04-23
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Assembled aluminum alloy handrail and assembling method thereof
European Patent Office | 2021
|Handrail connecting assembly and assembling method thereof
European Patent Office | 2022
|