A platform for research: civil engineering, architecture and urbanism
Fabricated type double-column elevated station
The invention discloses a fabricated type double-column elevated station. The fabricated type double-column elevated station comprises a three-layer structure, namely a platform layer, a station hall layer and a ground layer which are sequentially distributed from top to bottom; double pier columns are fixed to a station bearing platform; lower-layer flower basket type cantilever capping beams are fixed on the double pier columns; station hall layer longitudinal beams and station hall layer prestress double-T plates are placed on the lower-layer flower basket type cantilever capping beams; station hall layer double columns are fixed on the lower-layer flower basket type cantilever capping beams; upper-layer cantilever cross beams are fixed on the station hall layer double columns; track beams, platform beams and platform layer prestress double-T plates are placed on upper-layer cantilever cross beam supports and are of a structure shaped like a Chinese character 'kai' as a whole. According to the fabricated type double-column elevated station, fabricated construction of the elevated station can be achieved, main components are prefabricated in a factory and transported to a site for assembly, and compared with a traditional cast-in-place concrete elevated station, the construction period can be shortened, the influence on the surrounding environment is reduced, and the elevated station adapts to the future development direction.
本发明公开了一种装配式双柱高架车站,包括三层结构,分别为站台层、站厅层及地面层自上到下依次分布,其中,双墩柱固定于车站承台上,下层花篮型悬臂盖梁固定于双墩柱上,站厅层纵梁和站厅层预应力双T板搁置于下层花篮型悬臂盖梁上,站厅层双柱固定于下层花篮型悬臂盖梁上,上层悬臂横梁固定于站厅层双柱上,轨道梁、站台梁和站台层预应力双T板搁置于上层悬臂横梁支座上,整体呈“开”字型结构。本发明可实现高架车站装配化建造,主要构件工厂化预制,再运输至现场拼装,相较于传统的现浇混凝土高架车站,可缩短施工周期,减少对周边环境影响,适应未来发展方向。
Fabricated type double-column elevated station
The invention discloses a fabricated type double-column elevated station. The fabricated type double-column elevated station comprises a three-layer structure, namely a platform layer, a station hall layer and a ground layer which are sequentially distributed from top to bottom; double pier columns are fixed to a station bearing platform; lower-layer flower basket type cantilever capping beams are fixed on the double pier columns; station hall layer longitudinal beams and station hall layer prestress double-T plates are placed on the lower-layer flower basket type cantilever capping beams; station hall layer double columns are fixed on the lower-layer flower basket type cantilever capping beams; upper-layer cantilever cross beams are fixed on the station hall layer double columns; track beams, platform beams and platform layer prestress double-T plates are placed on upper-layer cantilever cross beam supports and are of a structure shaped like a Chinese character 'kai' as a whole. According to the fabricated type double-column elevated station, fabricated construction of the elevated station can be achieved, main components are prefabricated in a factory and transported to a site for assembly, and compared with a traditional cast-in-place concrete elevated station, the construction period can be shortened, the influence on the surrounding environment is reduced, and the elevated station adapts to the future development direction.
本发明公开了一种装配式双柱高架车站,包括三层结构,分别为站台层、站厅层及地面层自上到下依次分布,其中,双墩柱固定于车站承台上,下层花篮型悬臂盖梁固定于双墩柱上,站厅层纵梁和站厅层预应力双T板搁置于下层花篮型悬臂盖梁上,站厅层双柱固定于下层花篮型悬臂盖梁上,上层悬臂横梁固定于站厅层双柱上,轨道梁、站台梁和站台层预应力双T板搁置于上层悬臂横梁支座上,整体呈“开”字型结构。本发明可实现高架车站装配化建造,主要构件工厂化预制,再运输至现场拼装,相较于传统的现浇混凝土高架车站,可缩短施工周期,减少对周边环境影响,适应未来发展方向。
Fabricated type double-column elevated station
一种装配式双柱高架车站
XU YAZHOU (author) / QU PEIZHENG (author) / WANG ZHIPENG (author) / WEI KELUN (author)
2021-04-30
Patent
Electronic Resource
Chinese
Double-column-support four-column assembly type elevated station
European Patent Office | 2021
|Assembly type double-column elevated station beam column connecting joint
European Patent Office | 2024
|European Patent Office | 2021
|Assembly type single-column elevated station beam column connecting joint
European Patent Office | 2024
|