The invention relates to an outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction process. The outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction process comprises the following steps of cleaning a painting layer on the inner side face of an outer wall needing to be reworked, then coating the painting layer by adopting special outer wall glue, and then pasting the glued wall surface by adopting a special heat preservation board so as to form a complete heat preservation layer, pasting a gauze element on the heat preservation board through the glue, coating the wall surface with special outer wall paint, and after completing the coating, completing modification of the outer wall. The outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction technology has the advantages that the outer wall is not damaged, the construction pattern of the outer wall is kept, a large amount of construction waste is not generated, dust pollution to a construction unit is reduced, the construction board is made of a refractory material, fire hazards are avoided, fire operation does not need during construction, fire potential safety hazards are avoided, the construction is combined construction, the construction period is shorter, the normal production operation of a unit is not influenced, and the heat insulation effect is greatly improved.
本发明涉及一种外墙多层复合保温隔热防火施工工艺,包括下述步骤:对需要改造的外墙的内侧面的粉刷层进行清理,然后采用特殊外墙胶对粉刷层进行涂装,再采用特制的保温板材对涂胶后的墙面进行粘贴,从而形成完整的保温层,采用胶水将纱网粘贴在保温板材上,采用特种外墙涂料对墙面进行涂装,在涂装完成后,完成对外墙的改造。本发明的优点在于:不破坏外墙,保持外墙原因的施工格局,不产生大量施工垃圾,减少对施工单位的粉尘污染,施工板材为耐火材料,不存在火灾隐患,施工时不需要动火作业,不存在动火安全隐患,该施工为组合施工,施工工期较短,不影响单位正常生产作业,保温隔热效果得到大幅提升。
The invention relates to an outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction process. The outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction process comprises the following steps of cleaning a painting layer on the inner side face of an outer wall needing to be reworked, then coating the painting layer by adopting special outer wall glue, and then pasting the glued wall surface by adopting a special heat preservation board so as to form a complete heat preservation layer, pasting a gauze element on the heat preservation board through the glue, coating the wall surface with special outer wall paint, and after completing the coating, completing modification of the outer wall. The outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction technology has the advantages that the outer wall is not damaged, the construction pattern of the outer wall is kept, a large amount of construction waste is not generated, dust pollution to a construction unit is reduced, the construction board is made of a refractory material, fire hazards are avoided, fire operation does not need during construction, fire potential safety hazards are avoided, the construction is combined construction, the construction period is shorter, the normal production operation of a unit is not influenced, and the heat insulation effect is greatly improved.
本发明涉及一种外墙多层复合保温隔热防火施工工艺,包括下述步骤:对需要改造的外墙的内侧面的粉刷层进行清理,然后采用特殊外墙胶对粉刷层进行涂装,再采用特制的保温板材对涂胶后的墙面进行粘贴,从而形成完整的保温层,采用胶水将纱网粘贴在保温板材上,采用特种外墙涂料对墙面进行涂装,在涂装完成后,完成对外墙的改造。本发明的优点在于:不破坏外墙,保持外墙原因的施工格局,不产生大量施工垃圾,减少对施工单位的粉尘污染,施工板材为耐火材料,不存在火灾隐患,施工时不需要动火作业,不存在动火安全隐患,该施工为组合施工,施工工期较短,不影响单位正常生产作业,保温隔热效果得到大幅提升。
Outer wall multi-layer composite heat preservation, heat insulation and fire prevention construction technology
一种外墙多层复合保温隔热防火施工工艺
JIANG BIN (author)
2021-05-04
Patent
Electronic Resource
Chinese
Slurry composite vacuum heat insulation outer wall fireproof heat preservation system
European Patent Office | 2024
|European Patent Office | 2020
|European Patent Office | 2015
|Construction method of outer wall with heat insulation and heat preservation functions
European Patent Office | 2021
|Heat preservation and insulation outer wall and construction method thereof
European Patent Office | 2023
|