A platform for research: civil engineering, architecture and urbanism
Rapid restoration method used after urban road well lid sinking
The invention particularly relates to a rapid restoration method used after urban road well lid sinking. The problems that an existing maintenance method used after urban road well lid sinking wastes time and labor, is high in maintenance cost and affects normal operation of a road are solved. The rapid restoration method used after urban road well lid sinking comprises the following steps that S1, a well lid device is installed; S2, preparation before maintenance is conducted; S3, coarse adjustment of the position of the well lid device is conducted; S4, fine adjustment of the position of the well lid device is conducted; S5, a butter layer is checked; S6, an asphalt pavement is repaired; and S7, a well lid body is restored. According to the rapid restoration method used after urban road well lid sinking, rapid restoration after well lid sinking is achieved, and the influence on normal operation of the road is small; and the well lid device can reasonably utilize part of components of an original well lid, machining and manufacturing are simplified, the advantages of being easy to manufacture, convenient to construct, rapid in maintenance, low in cost and the like are achieved, and the technology can be widely applied to urban newly-built road engineering and urban old road reconstruction and expansion engineering.
本发明具体是一种用于城市道路井盖下沉后的快速复位方法,解决了现有城市道路井盖下沉后的维修方法费时费工、维修成本高、影响道路正常运行的问题。一种用于城市道路井盖下沉后的快速复位方法,所述方法包括以下步骤:S1:井盖装置的安装;S2:维修前的准备;S3:井盖装置位置的粗调;S4:井盖装置位置的精调;S5:黄油层的检查;S6:沥青路面的修复;S7:井盖本体的复位。本发明实现了井盖下沉后的快速复位,对道路正常运行影响小;而且井盖装置能够合理利用原有井盖的部分组件,简化了加工制作,具有制作简单、施工方便、维修快捷、成本低廉等优势,该技术可在城市新建道路工程及城市旧路改、扩建工程中广泛应用。
Rapid restoration method used after urban road well lid sinking
The invention particularly relates to a rapid restoration method used after urban road well lid sinking. The problems that an existing maintenance method used after urban road well lid sinking wastes time and labor, is high in maintenance cost and affects normal operation of a road are solved. The rapid restoration method used after urban road well lid sinking comprises the following steps that S1, a well lid device is installed; S2, preparation before maintenance is conducted; S3, coarse adjustment of the position of the well lid device is conducted; S4, fine adjustment of the position of the well lid device is conducted; S5, a butter layer is checked; S6, an asphalt pavement is repaired; and S7, a well lid body is restored. According to the rapid restoration method used after urban road well lid sinking, rapid restoration after well lid sinking is achieved, and the influence on normal operation of the road is small; and the well lid device can reasonably utilize part of components of an original well lid, machining and manufacturing are simplified, the advantages of being easy to manufacture, convenient to construct, rapid in maintenance, low in cost and the like are achieved, and the technology can be widely applied to urban newly-built road engineering and urban old road reconstruction and expansion engineering.
本发明具体是一种用于城市道路井盖下沉后的快速复位方法,解决了现有城市道路井盖下沉后的维修方法费时费工、维修成本高、影响道路正常运行的问题。一种用于城市道路井盖下沉后的快速复位方法,所述方法包括以下步骤:S1:井盖装置的安装;S2:维修前的准备;S3:井盖装置位置的粗调;S4:井盖装置位置的精调;S5:黄油层的检查;S6:沥青路面的修复;S7:井盖本体的复位。本发明实现了井盖下沉后的快速复位,对道路正常运行影响小;而且井盖装置能够合理利用原有井盖的部分组件,简化了加工制作,具有制作简单、施工方便、维修快捷、成本低廉等优势,该技术可在城市新建道路工程及城市旧路改、扩建工程中广泛应用。
Rapid restoration method used after urban road well lid sinking
一种用于城市道路井盖下沉后的快速复位方法
WANG WENHUI (author) / CHEN ZHUO (author)
2021-05-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Anti-sinking sponge urban road, mold and construction method of anti-sinking sponge urban road
European Patent Office | 2024
|Construction method used in initial stage of sinking of sinking well
European Patent Office | 2020
|Open well sinking device, open well structure and open well sinking method
European Patent Office | 2023
|