A platform for research: civil engineering, architecture and urbanism
Plastering-free and concealed pipe grooving-free secondary structure wall and construction method thereof
The invention discloses a plastering-free and concealed pipe grooving-free secondary structure wall and a construction method thereof. The plastering-free and concealed pipe grooving-free secondary structure wall comprises a first steel component pre-buried in a floor, wherein a constructional column is welded to the upper portion of the first steel component; at least one side face of the constructional column is connected with a wall body formed by riveting a plurality of building blocks; mortar joints exist between the building blocks; a ring beam is arranged at the supporting joint of the wall body; the ring beam is welded to the contact position of the constructional column through a second steel component pre-buried in the end of the ring beam; and the top of the constructional column is fixedly connected with a structural beam. The common quality problem that secondary structure concrete is rough in quality is solved, the masonry quality of a filler wall is remarkably improved, and the plastering-free effect of the wall is achieved; and the technological measures of special pipe distribution building block wrapping and laying and pre-buried wire box matched building block assembling are adopted, the wall concealed wiring pipe grooving-free effect is achieved, energy saving and environment friendliness are promoted, and a good effect is achieved.
本发明公开了一种免抹灰、暗管免开槽的二次结构墙体及其施工方法,包括预埋在楼面上的第一钢构件,第一钢构件上部焊接有构造柱,构造柱至少一侧面连接有由若干个砌块铆接而成的墙体,每个砌块之间的存在灰缝,墙体的支撑节点处设有圈梁,圈梁通过预埋在其端部的第二钢构件与构造柱的接触处焊接,构造柱的顶部与结构梁固定连接。解决了二次结构混凝土质量粗糙的质量通病,显著提高填充墙砌筑质量,实现墙体免抹灰功效;采用专用布管砌块包砌、预埋线盒配套砌块装配的工艺措施,实现墙体暗敷线管免开槽功效,促进节能环保具有良好的效果。
Plastering-free and concealed pipe grooving-free secondary structure wall and construction method thereof
The invention discloses a plastering-free and concealed pipe grooving-free secondary structure wall and a construction method thereof. The plastering-free and concealed pipe grooving-free secondary structure wall comprises a first steel component pre-buried in a floor, wherein a constructional column is welded to the upper portion of the first steel component; at least one side face of the constructional column is connected with a wall body formed by riveting a plurality of building blocks; mortar joints exist between the building blocks; a ring beam is arranged at the supporting joint of the wall body; the ring beam is welded to the contact position of the constructional column through a second steel component pre-buried in the end of the ring beam; and the top of the constructional column is fixedly connected with a structural beam. The common quality problem that secondary structure concrete is rough in quality is solved, the masonry quality of a filler wall is remarkably improved, and the plastering-free effect of the wall is achieved; and the technological measures of special pipe distribution building block wrapping and laying and pre-buried wire box matched building block assembling are adopted, the wall concealed wiring pipe grooving-free effect is achieved, energy saving and environment friendliness are promoted, and a good effect is achieved.
本发明公开了一种免抹灰、暗管免开槽的二次结构墙体及其施工方法,包括预埋在楼面上的第一钢构件,第一钢构件上部焊接有构造柱,构造柱至少一侧面连接有由若干个砌块铆接而成的墙体,每个砌块之间的存在灰缝,墙体的支撑节点处设有圈梁,圈梁通过预埋在其端部的第二钢构件与构造柱的接触处焊接,构造柱的顶部与结构梁固定连接。解决了二次结构混凝土质量粗糙的质量通病,显著提高填充墙砌筑质量,实现墙体免抹灰功效;采用专用布管砌块包砌、预埋线盒配套砌块装配的工艺措施,实现墙体暗敷线管免开槽功效,促进节能环保具有良好的效果。
Plastering-free and concealed pipe grooving-free secondary structure wall and construction method thereof
一种免抹灰、暗管免开槽的二次结构墙体及其施工方法
WANG ZHIYONG (author) / LIU QIANG (author) / CAI JIANZHEN (author) / ZHAO ZHONGHUA (author) / ZHANG PANPAN (author) / LIU ANYANG (author) / LU ZANZAN (author) / FAN JIANWEI (author) / CHEN BIN (author) / LI ZHONGJIAN (author)
2021-05-11
Patent
Electronic Resource
Chinese
Wall concealed laying pipeline grooving-free construction method
European Patent Office | 2022
|European Patent Office | 2024
|Wall plastering-free aluminum formwork construction process
European Patent Office | 2021
|