The invention discloses a steel beam hoisting system and method. The steel beam hoisting system is used for hoisting a steel beam in a steel structure building structure and is characterized by comprising a first construction area suitable for hoisting the steel beam by a tower crane or a truck crane, a second construction area provided with a steel beam hoisting device which is used for hoisting the steel beam, and a transferring device used for transferring the steel beam hoisted to the first construction area by the tower crane or the truck crane to a position below the steel beam hoisting device in the second construction area, so that the steel beam is hoisted by the steel beam hoisting device. The steel beam hoisting system can meet the steel beam hoisting requirements of large-span factory buildings and multi-layer floor structures. The steel beam hoisting method is simple in step, easy to operate, and capable of meeting the steel beam hoisting requirements of large-span factory buildings and multi-layer floor structures, and the efficiency of steel beam hoisting working is increased.
本发明公开了一种钢梁吊装系统与方法,其中钢梁吊装系统,用于钢结构建筑结构中钢梁的吊装,其特征在于,包括:第一施工区域,适于由塔吊或者车吊吊装钢梁;第二施工区域,设置有钢梁吊装装置,钢梁吊装装置用于吊装钢梁;转运装置,用于将由塔吊或者车吊吊至第一施工区域的钢梁转运至第二施工区域的钢梁吊装装置下,以由钢梁吊装装置对钢梁进行吊装。根据本发明的钢梁吊装系统,能够满足大跨度厂房及多层楼面结构的钢梁吊装需求。根据本发明的钢梁吊装方法,方法中的步骤简单,易于上手,能够满足大跨度厂房及多层楼面结构的钢梁吊装需求,且提高了钢梁吊装作业的效率。
Steel beam hoisting system and method
The invention discloses a steel beam hoisting system and method. The steel beam hoisting system is used for hoisting a steel beam in a steel structure building structure and is characterized by comprising a first construction area suitable for hoisting the steel beam by a tower crane or a truck crane, a second construction area provided with a steel beam hoisting device which is used for hoisting the steel beam, and a transferring device used for transferring the steel beam hoisted to the first construction area by the tower crane or the truck crane to a position below the steel beam hoisting device in the second construction area, so that the steel beam is hoisted by the steel beam hoisting device. The steel beam hoisting system can meet the steel beam hoisting requirements of large-span factory buildings and multi-layer floor structures. The steel beam hoisting method is simple in step, easy to operate, and capable of meeting the steel beam hoisting requirements of large-span factory buildings and multi-layer floor structures, and the efficiency of steel beam hoisting working is increased.
本发明公开了一种钢梁吊装系统与方法,其中钢梁吊装系统,用于钢结构建筑结构中钢梁的吊装,其特征在于,包括:第一施工区域,适于由塔吊或者车吊吊装钢梁;第二施工区域,设置有钢梁吊装装置,钢梁吊装装置用于吊装钢梁;转运装置,用于将由塔吊或者车吊吊至第一施工区域的钢梁转运至第二施工区域的钢梁吊装装置下,以由钢梁吊装装置对钢梁进行吊装。根据本发明的钢梁吊装系统,能够满足大跨度厂房及多层楼面结构的钢梁吊装需求。根据本发明的钢梁吊装方法,方法中的步骤简单,易于上手,能够满足大跨度厂房及多层楼面结构的钢梁吊装需求,且提高了钢梁吊装作业的效率。
Steel beam hoisting system and method
钢梁吊装系统与方法
XU SHUAI (author) / LIU HUANYUN (author) / HU XIANWEN (author) / XU SONG (author) / GUO SHENGCHAO (author) / LI JIAN (author) / JIANG XIONG (author) / HOU LIJUN (author)
2021-05-28
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|European Patent Office | 2023
|