Steel column beam hoisting construction method
The invention discloses a steel column beam hoisting construction method. The steel column beam hoisting construction method comprises the following process flows of components, equipment and personnel preparation-> paying-off and line inspection->pre-buried bolt acceptance inspection and foundation surface treatment->component center line and elevation line measurement->first-section steel columninstallation->first-section steel column correction and acceptance inspection->ultrasonic flaw detection->second-section steel column installation->second-section steel column correction and acceptance inspection->ultrasonic flaw detection->first-section steel beam installation and beam and column joint welding and bolt connection->first-section steel beam correction and acceptance inspection->ultrasonic flaw detection->second-section steel beam installation->beam and column joint welding and bolt connection->second-section steel beam correction and acceptance inspection, ultrasonic flaw detection, third-section steel column installation, third-section steel column correction and acceptance inspection->ultrasonic flaw detection->third-section steel beam installation->beam and column jointwelding and bolt connection->third-section steel beam correction and acceptance inspection->ultrasonic flaw detection->sporadic component installation->preparation work of the next flow section. Thesteel column beam hoisting construction method is efficient, safe and worthy of popularization.
本发明公开了一种钢柱梁吊装施工方法,包括如下工艺流程:构件、设备及人员准备→放线及验线→预埋螺栓验收及基础面处理→构件中心线及标高线→安装第一节钢柱→第一节钢柱校正验收→超声波探伤→安装第二节钢柱→第二节钢柱校正验收→超声波探伤→安装第一段钢梁→梁与柱节点焊接、螺栓连接→第一段钢梁校正验收→超声波探伤→安装第二段钢梁→梁与柱节点焊接、螺栓连接→第二段钢梁校正验收→超声波探伤→安装第三节钢柱→第三节钢柱校正验收→超声波探伤→安装第三段钢梁→梁与柱节点焊接、螺栓连接→第三段钢梁校正验收→超声波探伤→零星构件安装→下一节流水段准备工作。该方法高效安全,值得推广。
Steel column beam hoisting construction method
The invention discloses a steel column beam hoisting construction method. The steel column beam hoisting construction method comprises the following process flows of components, equipment and personnel preparation-> paying-off and line inspection->pre-buried bolt acceptance inspection and foundation surface treatment->component center line and elevation line measurement->first-section steel columninstallation->first-section steel column correction and acceptance inspection->ultrasonic flaw detection->second-section steel column installation->second-section steel column correction and acceptance inspection->ultrasonic flaw detection->first-section steel beam installation and beam and column joint welding and bolt connection->first-section steel beam correction and acceptance inspection->ultrasonic flaw detection->second-section steel beam installation->beam and column joint welding and bolt connection->second-section steel beam correction and acceptance inspection, ultrasonic flaw detection, third-section steel column installation, third-section steel column correction and acceptance inspection->ultrasonic flaw detection->third-section steel beam installation->beam and column jointwelding and bolt connection->third-section steel beam correction and acceptance inspection->ultrasonic flaw detection->sporadic component installation->preparation work of the next flow section. Thesteel column beam hoisting construction method is efficient, safe and worthy of popularization.
本发明公开了一种钢柱梁吊装施工方法,包括如下工艺流程:构件、设备及人员准备→放线及验线→预埋螺栓验收及基础面处理→构件中心线及标高线→安装第一节钢柱→第一节钢柱校正验收→超声波探伤→安装第二节钢柱→第二节钢柱校正验收→超声波探伤→安装第一段钢梁→梁与柱节点焊接、螺栓连接→第一段钢梁校正验收→超声波探伤→安装第二段钢梁→梁与柱节点焊接、螺栓连接→第二段钢梁校正验收→超声波探伤→安装第三节钢柱→第三节钢柱校正验收→超声波探伤→安装第三段钢梁→梁与柱节点焊接、螺栓连接→第三段钢梁校正验收→超声波探伤→零星构件安装→下一节流水段准备工作。该方法高效安全,值得推广。
Steel column beam hoisting construction method
一种钢柱梁吊装施工方法
YANG LEI (author) / DIAO CHUAN (author) / REN JIE (author) / HU SEN (author) / YANG FAN (author) / LUO CHAOHU (author) / ZHANG YURONG (author) / AN JIAN (author) / YE JIANHUA (author) / WANG WEI (author)
2020-09-18
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Steel column hoisting device and construction method thereof
European Patent Office | 2023
|Hoisting construction method for shielding steel column position of foundation pit supporting beam
European Patent Office | 2023
|