A platform for research: civil engineering, architecture and urbanism
Creeping formwork structure and construction method thereof
The invention discloses a creeping formwork structure and a construction method thereof. The method comprises the steps that an outer creeping formwork device is assembled on the ground and hoisted to a wall of a construction floor; a supporting frame is assembled on the ground, and an operation platform is mounted on the supporting frame; the supporting frame is hoisted to a floor plate of the construction floor and mounted on the floor plate of the construction floor; and an inner formwork of the wall of the construction floor is mounted on the operation platform, and the inner formwork and the outer creeping formwork device are oppositely arranged to form a pouring space of the wall of the construction floor. The construction method of the creeping formwork structure is high in stability, and the safety of high-floor formwork construction is improved; and the creeping formwork structure can still be in a stable state even in the high-floor and high-wind-power construction environment, and the safety of high-floor overall construction is improved.
本发明公开了一种爬模结构及爬模结构施工方法,该方法通过在地面拼装外爬模装置,并将所述外爬模装置吊装至施工楼层的墙体处;在地面拼装支撑架,在所述支撑架上安装作业平台;将所述支撑架吊装置至施工楼层的楼层板处,并将所述支撑架安装在施工楼层的楼层板上;将施工楼层的墙体内模板安装在所述作业平台上,所述内模板与所述外爬模装置相对设置并形成施工楼层的墙体的浇筑空间。本发明的爬模结构施工方法稳定性较高,提高了高楼层模板施工的安全性;即使在高楼层和风力较大的施工环境下依然能够处于稳定状态,提升了高楼层整体施工的安全性。
Creeping formwork structure and construction method thereof
The invention discloses a creeping formwork structure and a construction method thereof. The method comprises the steps that an outer creeping formwork device is assembled on the ground and hoisted to a wall of a construction floor; a supporting frame is assembled on the ground, and an operation platform is mounted on the supporting frame; the supporting frame is hoisted to a floor plate of the construction floor and mounted on the floor plate of the construction floor; and an inner formwork of the wall of the construction floor is mounted on the operation platform, and the inner formwork and the outer creeping formwork device are oppositely arranged to form a pouring space of the wall of the construction floor. The construction method of the creeping formwork structure is high in stability, and the safety of high-floor formwork construction is improved; and the creeping formwork structure can still be in a stable state even in the high-floor and high-wind-power construction environment, and the safety of high-floor overall construction is improved.
本发明公开了一种爬模结构及爬模结构施工方法,该方法通过在地面拼装外爬模装置,并将所述外爬模装置吊装至施工楼层的墙体处;在地面拼装支撑架,在所述支撑架上安装作业平台;将所述支撑架吊装置至施工楼层的楼层板处,并将所述支撑架安装在施工楼层的楼层板上;将施工楼层的墙体内模板安装在所述作业平台上,所述内模板与所述外爬模装置相对设置并形成施工楼层的墙体的浇筑空间。本发明的爬模结构施工方法稳定性较高,提高了高楼层模板施工的安全性;即使在高楼层和风力较大的施工环境下依然能够处于稳定状态,提升了高楼层整体施工的安全性。
Creeping formwork structure and construction method thereof
爬模结构及爬模结构施工方法
YANG LEI (author) / JIANG JIGUO (author) / XUE XIAOHONG (author) / LIU DEBING (author) / WU HONGBING (author) / DUAN FENG (author) / JIANG ZIQI (author) / HUANG ZHENGYE (author) / ZHOU JIAN (author) / GONG FUCAI (author)
2021-05-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Solar cell creeping formwork guardrail and creeping formwork
European Patent Office | 2023
|Hydraulic creeping formwork platform plate fixing structure and construction method thereof
European Patent Office | 2020
|European Patent Office | 2023
|