Core tube creeping formwork and horizontal structure aluminum formwork combined system and construction method thereof
The invention discloses a core tube creeping formwork and horizontal structure aluminum formwork combined system and a construction method thereof. The core tube creeping formwork and horizontal structure aluminum formwork combined system comprises a core tube outer wall creeping formwork, a core tube well creeping formwork and a horizontal structure aluminum formwork. The core tube outer wall creeping formwork is installed on the outer side of the core tube structure outer wall, the core tube well creeping formwork is installed on the structure beam plates, the horizontal structure aluminum formwork is installed between the structure beam plates of two adjacent floors, and the side face of the horizontal structure aluminum formwork is installed on the core tube structure outer wall. And through the arrangement of the core tube outer wall creeping formwork, the core tube well creeping formwork and the horizontal structure aluminum formwork, the construction quality of the core tube structure is guaranteed, the construction progress is accelerated, and the operation safety of operators can be guaranteed. A core tube wall and beam plate synchronous rapid construction method solves the problems that a traditional super high-rise core tube wall is advanced, the construction speed of a beam plate in a core tube is low, and fire protection evacuation of personnel on a core tube working face is difficult, operation is easy and convenient, and construction is safe.
本发明公开了一种核心筒爬模与水平结构铝模结合体系及其施工方法,包括:核心筒外墙爬模、核心筒井道爬模和水平结构铝模;核心筒外墙爬模安装在核心筒结构外墙的外侧,核心筒井道爬模的安装在结构梁板上,水平结构铝模安装在相邻两层楼的结构梁板之间,且水平结构铝模的侧面安装在核心筒结构外墙上。核心筒外墙爬模、核心筒井道爬模及水平结构铝模的设置,既保证了核心筒结构施工质量,又加快了施工进度,还能保证作业人员的操作安全。核心筒墙体与梁板同步快速施工方法,解决了传统超高层核心筒墙体先行,核心筒内梁板施工速度慢,核心筒作业面人员消防疏散难问题,操作简便,施工安全。
Core tube creeping formwork and horizontal structure aluminum formwork combined system and construction method thereof
The invention discloses a core tube creeping formwork and horizontal structure aluminum formwork combined system and a construction method thereof. The core tube creeping formwork and horizontal structure aluminum formwork combined system comprises a core tube outer wall creeping formwork, a core tube well creeping formwork and a horizontal structure aluminum formwork. The core tube outer wall creeping formwork is installed on the outer side of the core tube structure outer wall, the core tube well creeping formwork is installed on the structure beam plates, the horizontal structure aluminum formwork is installed between the structure beam plates of two adjacent floors, and the side face of the horizontal structure aluminum formwork is installed on the core tube structure outer wall. And through the arrangement of the core tube outer wall creeping formwork, the core tube well creeping formwork and the horizontal structure aluminum formwork, the construction quality of the core tube structure is guaranteed, the construction progress is accelerated, and the operation safety of operators can be guaranteed. A core tube wall and beam plate synchronous rapid construction method solves the problems that a traditional super high-rise core tube wall is advanced, the construction speed of a beam plate in a core tube is low, and fire protection evacuation of personnel on a core tube working face is difficult, operation is easy and convenient, and construction is safe.
本发明公开了一种核心筒爬模与水平结构铝模结合体系及其施工方法,包括:核心筒外墙爬模、核心筒井道爬模和水平结构铝模;核心筒外墙爬模安装在核心筒结构外墙的外侧,核心筒井道爬模的安装在结构梁板上,水平结构铝模安装在相邻两层楼的结构梁板之间,且水平结构铝模的侧面安装在核心筒结构外墙上。核心筒外墙爬模、核心筒井道爬模及水平结构铝模的设置,既保证了核心筒结构施工质量,又加快了施工进度,还能保证作业人员的操作安全。核心筒墙体与梁板同步快速施工方法,解决了传统超高层核心筒墙体先行,核心筒内梁板施工速度慢,核心筒作业面人员消防疏散难问题,操作简便,施工安全。
Core tube creeping formwork and horizontal structure aluminum formwork combined system and construction method thereof
一种核心筒爬模与水平结构铝模结合体系及其施工方法
ZHOU YUQI (author) / WANG JING (author) / LI JING (author) / LIU WEIWEI (author) / FAN XIN (author) / ZHAO QIANCHEN (author) / XU CHAOZHUO (author) / REN YAOHUI (author)
2023-03-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of super high-rise creeping formwork and aluminum formwork combined formwork
European Patent Office | 2023
|Creeping formwork assembly and core tube synchronous construction method
European Patent Office | 2023
|European Patent Office | 2023
|Creeping formwork structure and construction method thereof
European Patent Office | 2021
|