High-speed railway ballast track capacitor or electrical sleeper one-time laying method
The invention discloses a high-speed railway ballast track capacitor or electrical sleeper one-time laying method, which comprises the following steps: compiling a loading sequence table according to the designed mileage position of a capacitor or electrical sleeper, loading a common sleeper and the capacitor or electrical sleeper according to the loading sequence table, transporting to a site, and laying according to the sequence. The capacitor and the electric sleeper are laid in place at a time through a single-sleeper continuous method technology, the transition procedure of laying a common sleeper is omitted, manual later replacement is not needed, and therefore a large amount of labor cost and the purchase cost of common sleeper materials are saved, and a large amount of operation time is also saved. 800-1000 yuan can be saved by each capacitance sleeper on average.
本发明公开了一种高速铁路有砟轨道电容或电气枕一次性铺设方法,根据电容或电气枕的设计里程位置编制装车顺序表,将普通枕连同电容或电气枕按照装车顺序表装车运至现场并按照顺序铺设。本发明的电容、电气枕通过单枕连续法工艺一次性铺设到位,省去了铺设普通轨枕过渡的工序且无需人工后期抽换,这样不仅节省了大量劳动力成本和普通轨枕材料购置成本,而且还节省了大量作业时间。平均每根电容轨枕可以节省800‑1000元。
High-speed railway ballast track capacitor or electrical sleeper one-time laying method
The invention discloses a high-speed railway ballast track capacitor or electrical sleeper one-time laying method, which comprises the following steps: compiling a loading sequence table according to the designed mileage position of a capacitor or electrical sleeper, loading a common sleeper and the capacitor or electrical sleeper according to the loading sequence table, transporting to a site, and laying according to the sequence. The capacitor and the electric sleeper are laid in place at a time through a single-sleeper continuous method technology, the transition procedure of laying a common sleeper is omitted, manual later replacement is not needed, and therefore a large amount of labor cost and the purchase cost of common sleeper materials are saved, and a large amount of operation time is also saved. 800-1000 yuan can be saved by each capacitance sleeper on average.
本发明公开了一种高速铁路有砟轨道电容或电气枕一次性铺设方法,根据电容或电气枕的设计里程位置编制装车顺序表,将普通枕连同电容或电气枕按照装车顺序表装车运至现场并按照顺序铺设。本发明的电容、电气枕通过单枕连续法工艺一次性铺设到位,省去了铺设普通轨枕过渡的工序且无需人工后期抽换,这样不仅节省了大量劳动力成本和普通轨枕材料购置成本,而且还节省了大量作业时间。平均每根电容轨枕可以节省800‑1000元。
High-speed railway ballast track capacitor or electrical sleeper one-time laying method
高速铁路有砟轨道电容或电气枕一次性铺设方法
ZHAO YU (author) / WANG GUOQING (author) / GONG NANFU (author) / ZOU LEI (author) / WANG XIN (author) / CHEN LU (author) / WANG LIDONG (author)
2021-06-01
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
DEVICE AND METHOD FOR SLEEPER LAYING ON BALLAST CUSHION FOR RAILWAY CONSTRUCTION
European Patent Office | 2021
|