A platform for research: civil engineering, architecture and urbanism
Pile pipe hammering test equipment and test method
The invention provides pile pipe hammering test equipment and a test method. The pile pipe hammering test equipment comprises a supporting base body, a guide column, a pile pipe driving plate and a hammering device, wherein the guide column is fixed to the supporting base body and extends in the vertical direction, the pile pipe driving plate is slidably installed on the guide column, the lower side of the pile pipe driving plate is provided with a pile pipe connecting part used for being connected to a to-be-tested pile pipe, and the hammering device is used for applying downward hammering force to the upper side of the pile pipe driving plate. According to the pile pipe hammering test equipment and the test method, the technical problem of poor accuracy of an existing piling operation simulation test is relieved.
本发明提供了一种桩管锤入测试设备及测试方法,该桩管锤入测试设备包括:支撑座体、导向柱、桩管替打板和锤打装置;所述导向柱固定于所述支撑座体且沿竖直方向延伸设置;所述桩管替打板可滑动地安装于所述导向柱,所述桩管替打板的下侧设有用于连接待测桩管的桩管连接部;所述锤打装置用于向所述桩管替打板的上侧施加向下的锤击力。通过本发明,缓解了现有的打桩作业模拟测试所存在的准确性较差的技术问题。
Pile pipe hammering test equipment and test method
The invention provides pile pipe hammering test equipment and a test method. The pile pipe hammering test equipment comprises a supporting base body, a guide column, a pile pipe driving plate and a hammering device, wherein the guide column is fixed to the supporting base body and extends in the vertical direction, the pile pipe driving plate is slidably installed on the guide column, the lower side of the pile pipe driving plate is provided with a pile pipe connecting part used for being connected to a to-be-tested pile pipe, and the hammering device is used for applying downward hammering force to the upper side of the pile pipe driving plate. According to the pile pipe hammering test equipment and the test method, the technical problem of poor accuracy of an existing piling operation simulation test is relieved.
本发明提供了一种桩管锤入测试设备及测试方法,该桩管锤入测试设备包括:支撑座体、导向柱、桩管替打板和锤打装置;所述导向柱固定于所述支撑座体且沿竖直方向延伸设置;所述桩管替打板可滑动地安装于所述导向柱,所述桩管替打板的下侧设有用于连接待测桩管的桩管连接部;所述锤打装置用于向所述桩管替打板的上侧施加向下的锤击力。通过本发明,缓解了现有的打桩作业模拟测试所存在的准确性较差的技术问题。
Pile pipe hammering test equipment and test method
桩管锤入测试设备及测试方法
HU NANDING (author) / YANG JIN (author) / YU CHEN (author) / ZHOU JIANYI (author) / BAOSUDUNA (author) / WANG JIAKANG (author) / DING YIDA (author)
2021-06-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Hammering type prestressed pipe pile and construction method
European Patent Office | 2024
|Hammering construction method of pipe bottom of steel pipe pile
European Patent Office | 2020
|Hammering assistance method and system for pipe pile construction and hammering data sharing system
European Patent Office | 2022
|Pile Driving Analysis for Top Hammering and Bottom Hammering
British Library Online Contents | 2002
|Pile Driving Analysis for Top Hammering and Bottom Hammering
Online Contents | 2002
|