A platform for research: civil engineering, architecture and urbanism
CFG pile concrete press-grouting, over-grouting height and anti-pipe-blocking control device
The invention relates to the technical field of control devices, and discloses a CFG pile concrete press-grouting, over-grouting height and anti-pipe-blocking control device. The control device comprises a controller body, a display screen is fixedly connected to the side wall of the controller body, two operation panels located below the display screen are fixedly connected to the side wall of the controller body, a camera located between the two operation panels is fixedly connected to the side wall of the controller body, and a start-stop switch located below the camera is fixedly connected to the side wall of the controller body. According to the control device, a signal receiving plate is adjusted through rotation and vertical movement of the signal receiving plate, so that the signal receiving plate can be conveniently adjusted to a position with the best signal strength, the situation that concrete is over-grouted or a concrete conveying pipe is blocked due to the fact that signalers beside a concrete pump does not respond in time due to the influence of the current of the concrete pump on the signal of an interphone or the influence of the noise of a construction site on the signaler beside the concrete pump is avoided, and the requirements of users are met.
本发明涉及控制装置技术领域,且公开了一种CFG桩混凝土压灌、超灌高度和防堵管控制装置,包括控制器主体,所述控制器主体的侧壁上固定连接有显示屏,控制器主体的侧壁上固定连接有位于显示屏下方的两个操作盘,控制器主体的侧壁上固定连接有位于两个操作盘之间的摄像头,控制器主体的侧壁上固定连接有位于摄像头下方的启停开关。本发明通过信号接收板的旋转和上下移动对信号接收板进行调节,方便将信号接收板调节到信号强度最佳的位置,防止了混凝土泵机电流对对讲机信号的影响或施工现场噪音对混凝土泵旁的信号工的影响,造成混凝土泵旁的信号工回应不及时,从而引发混凝土超灌或混凝土输送管堵塞的情况出现,满足了使用者的需要。
CFG pile concrete press-grouting, over-grouting height and anti-pipe-blocking control device
The invention relates to the technical field of control devices, and discloses a CFG pile concrete press-grouting, over-grouting height and anti-pipe-blocking control device. The control device comprises a controller body, a display screen is fixedly connected to the side wall of the controller body, two operation panels located below the display screen are fixedly connected to the side wall of the controller body, a camera located between the two operation panels is fixedly connected to the side wall of the controller body, and a start-stop switch located below the camera is fixedly connected to the side wall of the controller body. According to the control device, a signal receiving plate is adjusted through rotation and vertical movement of the signal receiving plate, so that the signal receiving plate can be conveniently adjusted to a position with the best signal strength, the situation that concrete is over-grouted or a concrete conveying pipe is blocked due to the fact that signalers beside a concrete pump does not respond in time due to the influence of the current of the concrete pump on the signal of an interphone or the influence of the noise of a construction site on the signaler beside the concrete pump is avoided, and the requirements of users are met.
本发明涉及控制装置技术领域,且公开了一种CFG桩混凝土压灌、超灌高度和防堵管控制装置,包括控制器主体,所述控制器主体的侧壁上固定连接有显示屏,控制器主体的侧壁上固定连接有位于显示屏下方的两个操作盘,控制器主体的侧壁上固定连接有位于两个操作盘之间的摄像头,控制器主体的侧壁上固定连接有位于摄像头下方的启停开关。本发明通过信号接收板的旋转和上下移动对信号接收板进行调节,方便将信号接收板调节到信号强度最佳的位置,防止了混凝土泵机电流对对讲机信号的影响或施工现场噪音对混凝土泵旁的信号工的影响,造成混凝土泵旁的信号工回应不及时,从而引发混凝土超灌或混凝土输送管堵塞的情况出现,满足了使用者的需要。
CFG pile concrete press-grouting, over-grouting height and anti-pipe-blocking control device
一种CFG桩混凝土压灌、超灌高度和防堵管控制装置
ZHAO JIAGUI (author) / XIA ZHIJIN (author) / WEI PENGFEI (author)
2021-06-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Post-grouting device for prefabricated pipe pile, grouting method and grouting cement
European Patent Office | 2024
|High-pressure jet grouting pile grouting pipe plugging device
European Patent Office | 2023
|Steel pipe pile layered grouting device and grouting method
European Patent Office | 2023
|