A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of bridge construction, and particularly relates to a bridge and a bridge construction technology. Thetechnology comprises the following steps: switching on switch valves on a first connecting pipe and a second connecting pipe in a construction device, blowing air into a storage box through the operation of a first fan, enabling a soft silica gel ball to enter the storage box under the action of airflow, enabling the soft silica gel ball to fill a remaining space in the storage box, and discharging the airflow through air outlet holes in a box cover; and then, after the instrument for bridge construction is hoisted to a designated position, enabling the first fan to stop working, enabling the second fan to work, and blowing the air into a filler containing box. The bridge and the bridge construction technology have the advantage of avoiding interference to placement and taking of instruments for bridge construction.
本发明涉及桥梁施工技术领域,具体的说是一种桥梁及桥梁的施工工艺,包括将施工装置中第一连接管和第二连接管上的开关阀开启,通过第一风机工作,从而向存放箱内吹气,在气流的作用下,使得软质硅胶球进入到存放箱内,使得软质硅胶球填充满存放箱内剩余的空间,气流通过箱盖上的出气孔排出,接着当桥梁施工用的仪器吊装到指定位置后,通过第一风机停止工作,第二风机工作,从而向填充物放置箱内吹气,本发明具有避免对桥梁施工用仪器的放置与拿取造成干扰的优点。
The invention relates to the technical field of bridge construction, and particularly relates to a bridge and a bridge construction technology. Thetechnology comprises the following steps: switching on switch valves on a first connecting pipe and a second connecting pipe in a construction device, blowing air into a storage box through the operation of a first fan, enabling a soft silica gel ball to enter the storage box under the action of airflow, enabling the soft silica gel ball to fill a remaining space in the storage box, and discharging the airflow through air outlet holes in a box cover; and then, after the instrument for bridge construction is hoisted to a designated position, enabling the first fan to stop working, enabling the second fan to work, and blowing the air into a filler containing box. The bridge and the bridge construction technology have the advantage of avoiding interference to placement and taking of instruments for bridge construction.
本发明涉及桥梁施工技术领域,具体的说是一种桥梁及桥梁的施工工艺,包括将施工装置中第一连接管和第二连接管上的开关阀开启,通过第一风机工作,从而向存放箱内吹气,在气流的作用下,使得软质硅胶球进入到存放箱内,使得软质硅胶球填充满存放箱内剩余的空间,气流通过箱盖上的出气孔排出,接着当桥梁施工用的仪器吊装到指定位置后,通过第一风机停止工作,第二风机工作,从而向填充物放置箱内吹气,本发明具有避免对桥梁施工用仪器的放置与拿取造成干扰的优点。
Bridge and bridge construction technology
一种桥梁及桥梁的施工工艺
2021-06-08
Patent
Electronic Resource
Chinese
Ultrahigh-Performance Concrete Segmental Bridge Technology: Toward Sustainable Bridge Construction
Online Contents | 2015
|Ultrahigh-Performance Concrete Segmental Bridge Technology: Toward Sustainable Bridge Construction
British Library Online Contents | 2015
|Bridge abutment construction method, bridge pier construction method and bridge construction method
European Patent Office | 2023
|