Bridge bearing platform main steel bar construction positioning device and construction method thereof
The invention discloses a bridge bearing platform main steel bar construction positioning device and a construction method thereof, and the device comprises a stand column frame which is arranged on a cement cushion layer of a bridge bearing platform, a cross beam frame arranged at the upper end of the stand column frame and driven by a manual adjusting assembly to transversely move, a positioning disc arranged on the lower side of the middle of the cross beam frame, and having the horizontal position be adjusted relative to the cross beam frame, and a plurality of steel bar sleeves which are vertically arranged are arranged on the positioning disc, the horizontal position of the cross beam frame can be adjusted through the manual adjusting assembly; the positioning disc can also be adjusted and moved in the horizontal position, and the positioning disc can be adjusted at multiple angles on the horizontal plane. According to the method, rapid and accurate positioning can be achieved, impact on the spliced steel bars during pouring is reduced, the construction time is shortened, manpower is saved, and the cost is reduced.
本发明公开了一种桥梁承台主钢筋施工定位装置及其施工方法,包括:立柱框架,设置在桥梁承台的水泥垫层上;横梁框架,设置在立柱框架的上端,由手动调节组件驱动进行横向移动;定位盘,设置在横梁框架中部下侧,定位盘的水平位置可相对于横梁框架进行调节;所述的定位盘上设置有若干个呈竖向布置的钢筋套筒,通过手动调节组件可以调节横梁框架的水平位置,而定位盘也可以在水平位置上进行调节移动,实现定位盘在水平面上进行多个角度的调节。本发明可以实现快速精确定位,降低浇筑时,对拼接钢筋的冲击,减少施工时间,节约人力,降低成本。
Bridge bearing platform main steel bar construction positioning device and construction method thereof
The invention discloses a bridge bearing platform main steel bar construction positioning device and a construction method thereof, and the device comprises a stand column frame which is arranged on a cement cushion layer of a bridge bearing platform, a cross beam frame arranged at the upper end of the stand column frame and driven by a manual adjusting assembly to transversely move, a positioning disc arranged on the lower side of the middle of the cross beam frame, and having the horizontal position be adjusted relative to the cross beam frame, and a plurality of steel bar sleeves which are vertically arranged are arranged on the positioning disc, the horizontal position of the cross beam frame can be adjusted through the manual adjusting assembly; the positioning disc can also be adjusted and moved in the horizontal position, and the positioning disc can be adjusted at multiple angles on the horizontal plane. According to the method, rapid and accurate positioning can be achieved, impact on the spliced steel bars during pouring is reduced, the construction time is shortened, manpower is saved, and the cost is reduced.
本发明公开了一种桥梁承台主钢筋施工定位装置及其施工方法,包括:立柱框架,设置在桥梁承台的水泥垫层上;横梁框架,设置在立柱框架的上端,由手动调节组件驱动进行横向移动;定位盘,设置在横梁框架中部下侧,定位盘的水平位置可相对于横梁框架进行调节;所述的定位盘上设置有若干个呈竖向布置的钢筋套筒,通过手动调节组件可以调节横梁框架的水平位置,而定位盘也可以在水平位置上进行调节移动,实现定位盘在水平面上进行多个角度的调节。本发明可以实现快速精确定位,降低浇筑时,对拼接钢筋的冲击,减少施工时间,节约人力,降低成本。
Bridge bearing platform main steel bar construction positioning device and construction method thereof
一种桥梁承台主钢筋施工定位装置及其施工方法
XU XIUZHEN (author) / BAI YUEPIN (author) / WANG YUE (author) / CHENG JIHONG (author) / XU CHANGHUI (author) / LEI RUIDONG (author)
2021-06-08
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2021
|Bridge bearing platform construction device and construction method thereof
European Patent Office | 2024
|Bridge main pier bearing platform construction structure
European Patent Office | 2024
|Construction method of overwater bridge main pier bearing platform
European Patent Office | 2024
|Bridge main pier bearing platform and tower base construction method
European Patent Office | 2023
|