Construction method of prestressed immersed tunnel pipe joint
The invention provides a construction method of a prestressed immersed tunnel pipe joint. The construction method comprises the following steps of: binding pipe joint bottom plate steel bars in a dry dock, laying prestressed tensioned sleeves and steel strands, and pouring pipe joint bottom plate concrete; constructing pipe joint side wall and middle partition wall reinforced concrete; binding pipe joint top plate steel bars, laying prestressed tensioned sleeves and steel strands, and pouring top plate concrete; constructing door sealing structures at two ends of the pipe joint; locking the steel strands in anchoring ends on the pipe joint side walls, after the strength of the pipe joint concrete reaches a design value, horizontally tensioning the steel strands of the top plate and the bottom plate at the middle partition wall from the tensioning ends, and after the steel strands reach a tensioning preset value, locking the steel strands; grouting in the embedded sleeves, blocking the sleeves, and blocking anchorage device hand holes; and constructing a pipe joint outer waterproof layer, floating the pipe joint in the dry dock, mounting fitting-out components, and preparing pipe joint floating transportation. The construction method is suitable for reinforced concrete pipe joints with larger spans, and the adaptability of an immersed tunnel is enhanced; and the durability of the pipe joint can be improved, and the total construction cost of the immersed tunnel can be greatly reduced.
本发明提供了一种预应力沉管隧道管节建造方法,在干坞内绑扎管节底板钢筋,铺设预应力张拉的套管及钢绞线,浇筑管节底板混凝土;施工管节侧墙及中隔墙钢筋混凝土;绑扎管节顶板钢筋,铺设预应力张拉的套管及钢绞线,浇筑顶板混凝土;施工管节两端封门结构;钢绞线锁定在管节侧墙上的锚固端内,管节混凝土强度达到设计值后,顶板、底板的钢绞线同时在中隔墙处由张拉端水平张拉,到达张拉预定值后,锁定钢绞线;在预埋套管内注浆,套管封堵,锚具手孔封堵;施工管节外防水层,管节干坞内起浮,安装舾装构件,准备管节浮运。本发明适应于更大跨度的钢筋混凝土管节,沉管隧道适应性增强;可提高管节的耐久性,并且可大大降低沉管隧道总造价。
Construction method of prestressed immersed tunnel pipe joint
The invention provides a construction method of a prestressed immersed tunnel pipe joint. The construction method comprises the following steps of: binding pipe joint bottom plate steel bars in a dry dock, laying prestressed tensioned sleeves and steel strands, and pouring pipe joint bottom plate concrete; constructing pipe joint side wall and middle partition wall reinforced concrete; binding pipe joint top plate steel bars, laying prestressed tensioned sleeves and steel strands, and pouring top plate concrete; constructing door sealing structures at two ends of the pipe joint; locking the steel strands in anchoring ends on the pipe joint side walls, after the strength of the pipe joint concrete reaches a design value, horizontally tensioning the steel strands of the top plate and the bottom plate at the middle partition wall from the tensioning ends, and after the steel strands reach a tensioning preset value, locking the steel strands; grouting in the embedded sleeves, blocking the sleeves, and blocking anchorage device hand holes; and constructing a pipe joint outer waterproof layer, floating the pipe joint in the dry dock, mounting fitting-out components, and preparing pipe joint floating transportation. The construction method is suitable for reinforced concrete pipe joints with larger spans, and the adaptability of an immersed tunnel is enhanced; and the durability of the pipe joint can be improved, and the total construction cost of the immersed tunnel can be greatly reduced.
本发明提供了一种预应力沉管隧道管节建造方法,在干坞内绑扎管节底板钢筋,铺设预应力张拉的套管及钢绞线,浇筑管节底板混凝土;施工管节侧墙及中隔墙钢筋混凝土;绑扎管节顶板钢筋,铺设预应力张拉的套管及钢绞线,浇筑顶板混凝土;施工管节两端封门结构;钢绞线锁定在管节侧墙上的锚固端内,管节混凝土强度达到设计值后,顶板、底板的钢绞线同时在中隔墙处由张拉端水平张拉,到达张拉预定值后,锁定钢绞线;在预埋套管内注浆,套管封堵,锚具手孔封堵;施工管节外防水层,管节干坞内起浮,安装舾装构件,准备管节浮运。本发明适应于更大跨度的钢筋混凝土管节,沉管隧道适应性增强;可提高管节的耐久性,并且可大大降低沉管隧道总造价。
Construction method of prestressed immersed tunnel pipe joint
一种预应力沉管隧道管节建造方法
HE WEIGUO (author) / ZHOU HUAGUI (author) / CAO WEI (author) / FAN GUOGANG (author)
2021-06-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of submarine immersed tunnel pipe joint
European Patent Office | 2023
|Segmented bonding prestressed pipe used for immersed tunnel
European Patent Office | 2015
|Immersed pipe prestressed steel strand cut-off pipe and construction method thereof
European Patent Office | 2023
|Immersed tunnel rapid construction method based on flat ground pipe joint prefabrication
European Patent Office | 2022
|Construction method of immersed tube joint in immersed tube tunnel and immersed tube joint structure
European Patent Office | 2021
|