A platform for research: civil engineering, architecture and urbanism
The invention discloses a steel beam installation construction device for a high-rise steel structure, and relates to the technical field of steel structure steel beam installation construction devices. In order to ensure that the steel beam does not incline in an installing process, the steel beam installation construction device specifically comprises a scaffold, a lifting plate, a steel beam and a supporting column, two installing frames are fixed to the outer wall of the top of the lifting plate through bolts, the inner walls of the two sides of the two installing frames are each rotationally connected to two conveying rollers or above, the circumferential outer walls of the two conveying rollers or above located on the same installing frame are rotationally connected to the same conveying belt, a supporting plate is fixed to the outer wall of the top of the lifting plate through bolts, a third gear column is rotationally connected to the outer wall of one side of the supporting plate, two second limiting columns are fixed to the outer wall of the top of the lifting plate through screws, and the same pressing plate is slidably connected to the circumferential outer walls of the two second limiting columns. According to the steel beam installation construction device, the bottom of the steel beam can be supported through the conveying belt and the conveying rollers, meanwhile, the steel beam is conveyed to an installation site, and the installation speed can be increased.
本发明公开了一种高层钢结构钢梁安装施工装置,涉及钢结构钢梁安装施工装置技术领域;为了保证钢梁在安装过程中不会出现歪斜;具体包括脚手架、升降板、钢梁和支撑柱,所述升降板顶部外壁通过螺栓固定有两个安装架,两个安装架两侧内壁均转动连接有两个以上传送辊,位于同一个安装架上的两个以上传送辊圆周外壁转动连接有同一个传送带,所述升降板顶部外壁通过螺栓固定有支撑板,所述支撑板一侧外壁转动连接有齿轮柱三,所述升降板顶部外壁通过螺丝固定有两个限位柱二,两个所述限位柱二圆周外壁滑动连接有同一个压板。本发明通过传送带和传送辊可以对钢梁底部进行支撑的同时将钢梁传送到安装地点,可以提高安装的速率。
The invention discloses a steel beam installation construction device for a high-rise steel structure, and relates to the technical field of steel structure steel beam installation construction devices. In order to ensure that the steel beam does not incline in an installing process, the steel beam installation construction device specifically comprises a scaffold, a lifting plate, a steel beam and a supporting column, two installing frames are fixed to the outer wall of the top of the lifting plate through bolts, the inner walls of the two sides of the two installing frames are each rotationally connected to two conveying rollers or above, the circumferential outer walls of the two conveying rollers or above located on the same installing frame are rotationally connected to the same conveying belt, a supporting plate is fixed to the outer wall of the top of the lifting plate through bolts, a third gear column is rotationally connected to the outer wall of one side of the supporting plate, two second limiting columns are fixed to the outer wall of the top of the lifting plate through screws, and the same pressing plate is slidably connected to the circumferential outer walls of the two second limiting columns. According to the steel beam installation construction device, the bottom of the steel beam can be supported through the conveying belt and the conveying rollers, meanwhile, the steel beam is conveyed to an installation site, and the installation speed can be increased.
本发明公开了一种高层钢结构钢梁安装施工装置,涉及钢结构钢梁安装施工装置技术领域;为了保证钢梁在安装过程中不会出现歪斜;具体包括脚手架、升降板、钢梁和支撑柱,所述升降板顶部外壁通过螺栓固定有两个安装架,两个安装架两侧内壁均转动连接有两个以上传送辊,位于同一个安装架上的两个以上传送辊圆周外壁转动连接有同一个传送带,所述升降板顶部外壁通过螺栓固定有支撑板,所述支撑板一侧外壁转动连接有齿轮柱三,所述升降板顶部外壁通过螺丝固定有两个限位柱二,两个所述限位柱二圆周外壁滑动连接有同一个压板。本发明通过传送带和传送辊可以对钢梁底部进行支撑的同时将钢梁传送到安装地点,可以提高安装的速率。
Steel beam installation construction device for high-rise steel structure
一种高层钢结构钢梁安装施工装置
AN BING (author)
2021-06-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2021
|Construction and installation method for super high-rise building steel structure
European Patent Office | 2021
|Construction and installation method of super high-rise building steel structure
European Patent Office | 2023
|