A platform for research: civil engineering, architecture and urbanism
Prefabricated green building system and construction method
The invention relates to the technical field of green buildings, in particular to a prefabricated green building system and a construction method. The prefabricated green building system comprises a bottom plate, side plates and at least four stand columns, wherein the stand columns are hinged to the bottom plate, fixed bases which are consistent with the stand columns in number and correspond to the stand columns one to one in position are arranged on the bottom plate, when the stand columns rotate to be perpendicular to the bottom plate, the stand columns are fixedly connected to the fixed bases through bolts respectively, a plurality of side plates are arranged between every two adjacent stand columns, a clamping strip is fixedly connected to one side of each side plate, a clamping groove which is matched with the clamping strip of the other side plate in a clamped mode is formed in the other side of each side plate, and limiting grooves which are matched with the stand columns in the clamped mode are formed in the sides, which face the side plates, of the stand columns. The prefabricated green building system has the effects that the working efficiency of workers is improved, and the workers can conveniently assemble the stand columns and the bottom plate.
本申请涉及绿色建筑的技术领域,尤其是涉及一种装配式绿色建筑体系及建造方法,其包括底板、侧板以及立柱,立柱设置有至少四根,且各立柱均铰接设置于底板,底板设置有与立柱数量一致且位置一一对应设置的固定座,立柱转动至与底板相垂直的状态时,各立柱通过螺栓分别固定连接于各固定座,侧板在相邻两立柱之间设置有若干,侧板的一侧固定连接有卡位条,侧板的另一侧开设有与另一侧板的卡位条卡接配合的卡位槽,立柱朝向侧板的一侧开设有与立柱卡接配合的限位槽。本申请具有提高工作人员的工作效率,便于工作人员对立柱和底板进行装配的效果。
Prefabricated green building system and construction method
The invention relates to the technical field of green buildings, in particular to a prefabricated green building system and a construction method. The prefabricated green building system comprises a bottom plate, side plates and at least four stand columns, wherein the stand columns are hinged to the bottom plate, fixed bases which are consistent with the stand columns in number and correspond to the stand columns one to one in position are arranged on the bottom plate, when the stand columns rotate to be perpendicular to the bottom plate, the stand columns are fixedly connected to the fixed bases through bolts respectively, a plurality of side plates are arranged between every two adjacent stand columns, a clamping strip is fixedly connected to one side of each side plate, a clamping groove which is matched with the clamping strip of the other side plate in a clamped mode is formed in the other side of each side plate, and limiting grooves which are matched with the stand columns in the clamped mode are formed in the sides, which face the side plates, of the stand columns. The prefabricated green building system has the effects that the working efficiency of workers is improved, and the workers can conveniently assemble the stand columns and the bottom plate.
本申请涉及绿色建筑的技术领域,尤其是涉及一种装配式绿色建筑体系及建造方法,其包括底板、侧板以及立柱,立柱设置有至少四根,且各立柱均铰接设置于底板,底板设置有与立柱数量一致且位置一一对应设置的固定座,立柱转动至与底板相垂直的状态时,各立柱通过螺栓分别固定连接于各固定座,侧板在相邻两立柱之间设置有若干,侧板的一侧固定连接有卡位条,侧板的另一侧开设有与另一侧板的卡位条卡接配合的卡位槽,立柱朝向侧板的一侧开设有与立柱卡接配合的限位槽。本申请具有提高工作人员的工作效率,便于工作人员对立柱和底板进行装配的效果。
Prefabricated green building system and construction method
一种装配式绿色建筑体系及建造方法
ZHENG WENLONG (author) / LI RIYAN (author) / ZHONG ZHIHONG (author) / LI HUILING (author)
2021-06-15
Patent
Electronic Resource
Chinese
Building material lifting device for green prefabricated building construction
European Patent Office | 2021
|CONSTRUCTION METHOD OF PREFABRICATED BUILDING AND PREFABRICATED BUILDING
European Patent Office | 2019
|