Dismantling method of outer wall of existing building
The invention relates to a dismantling method of an outer wall of an existing building. The dismantling method of the outer wall of the existing building comprises the following steps that a traction device close to the outer wall to be dismantled is fixedly installed on a floor of the existing building; the traction device is connected with the outer wall to be dismantled, and the outer wall to be dismantled is tensioned towards the inner side of the existing building through the traction device; tie bars on the side part of the outer wall to be dismantled are cut off; and the outer wall to be dismantled is pulled towards the inner side of the existing building through the traction device, so that the outer wall to be dismantled topples towards the inner side of the existing building, and therefore dismantling of the outer wall is completed. According to the dismantling method of the outer wall of the existing building, the traction device is adopted to pull down the outer wall towards the inner side, construction is easy and convenient, and cost is saved; in the dismantling process, inward prestress is applied to the outer wall through the traction device, so that it can be guaranteed that the outer wall cannot topple outwards in the outer wall cutting operation process, and the construction safety is improved; the traction device conducts traction operation, so that the safety problem that constructors are too close to the outer wall to be dismantled can be solved.
本发明涉及一种既有建筑外墙的拆除方法,包括如下步骤:于既有建筑的楼板上固定安装靠近待拆除的外墙设置的牵拉装置;将牵拉装置与待拆除的外墙连接,并利用牵拉装置向着既有建筑的内侧拉紧待拆除的外墙;将待拆除的外墙侧部的拉结筋切断;利用牵拉装置向着既有建筑的内侧牵拉待拆除的外墙,以使得待拆除的外墙向既有建筑的内侧倾倒,从而完成外墙的拆除。本发明的拆除方法采用牵拉装置向内侧拉倒外墙,施工简单方便,且节约成本。在拆除时,利用牵拉装置先对外墙施加向内侧的预应力,能够确保外墙切割作业过程中外墙不会向外倾倒,提高了施工的安全性。牵拉装置进行牵拉操作,可解决施工人员距离待拆除的外墙过近的安全问题。
Dismantling method of outer wall of existing building
The invention relates to a dismantling method of an outer wall of an existing building. The dismantling method of the outer wall of the existing building comprises the following steps that a traction device close to the outer wall to be dismantled is fixedly installed on a floor of the existing building; the traction device is connected with the outer wall to be dismantled, and the outer wall to be dismantled is tensioned towards the inner side of the existing building through the traction device; tie bars on the side part of the outer wall to be dismantled are cut off; and the outer wall to be dismantled is pulled towards the inner side of the existing building through the traction device, so that the outer wall to be dismantled topples towards the inner side of the existing building, and therefore dismantling of the outer wall is completed. According to the dismantling method of the outer wall of the existing building, the traction device is adopted to pull down the outer wall towards the inner side, construction is easy and convenient, and cost is saved; in the dismantling process, inward prestress is applied to the outer wall through the traction device, so that it can be guaranteed that the outer wall cannot topple outwards in the outer wall cutting operation process, and the construction safety is improved; the traction device conducts traction operation, so that the safety problem that constructors are too close to the outer wall to be dismantled can be solved.
本发明涉及一种既有建筑外墙的拆除方法,包括如下步骤:于既有建筑的楼板上固定安装靠近待拆除的外墙设置的牵拉装置;将牵拉装置与待拆除的外墙连接,并利用牵拉装置向着既有建筑的内侧拉紧待拆除的外墙;将待拆除的外墙侧部的拉结筋切断;利用牵拉装置向着既有建筑的内侧牵拉待拆除的外墙,以使得待拆除的外墙向既有建筑的内侧倾倒,从而完成外墙的拆除。本发明的拆除方法采用牵拉装置向内侧拉倒外墙,施工简单方便,且节约成本。在拆除时,利用牵拉装置先对外墙施加向内侧的预应力,能够确保外墙切割作业过程中外墙不会向外倾倒,提高了施工的安全性。牵拉装置进行牵拉操作,可解决施工人员距离待拆除的外墙过近的安全问题。
Dismantling method of outer wall of existing building
既有建筑外墙的拆除方法
TIAN LIGE (author) / ZHU CHUANQI (author) / SHI NAN (author)
2021-06-15
Patent
Electronic Resource
Chinese
High-rise building outer wall component dismantling method
European Patent Office | 2020
|Dismantling-free repairing method for outer wall body of high-rise building
European Patent Office | 2023
|Existing curtain wall dismantling automation method and system
European Patent Office | 2024
|Bottom-up dismantling method using existing building slab