High-rise building outer wall component dismantling method
The invention provides a high-rise building outer wall component dismantling method which comprises the following steps that a hard protective shed is erected on the first floor of a high-rise building, an existing window cleaning machine on a building roof is used for assisting construction, and a winch is erected on a window cleaning machine rail for assisting hoisting; a steel wire rope of thewinch is lowered to an outer wall component to be dismantled, and constructors on a riding track and/or constructors in a window cleaning machine hanging basket on the outer side of the outer wall component firmly connect the steel wire rope with local components in the outer wall component; the constructors on the riding track perform cutting operation on the local components, and the personnel in the hanging basket perform auxiliary operation; and after each local component of one outer wall component is cut, lifting to the roof under the driving of the winch and the guidance of the personnel in the hanging basket is achieved, and conveying into a top floor room through the window cleaning machine rail and transferring out through a goods elevator are achieved. By means of the high-risebuilding outer wall component dismantling method, double insurance is achieved when the component is prevented from falling off, and normal operation of a building is not affected in the dismantling process.
本发明提供了一种高层建筑外墙构件拆除方法,包括以下步骤:在高层建筑首层搭设硬质防护棚,用建筑屋顶已有的擦窗机辅助施工,并在擦窗机轨道上架设一台卷扬机辅助吊装;将卷扬机的钢丝绳下放到待拆除的外墙构件上,并由马道上的施工人员和/或外墙构件外侧的擦窗机吊篮内的施工人员将钢丝绳与外墙构件中的局部构件牢固连接;马道上的施工人员对局部构件进行切割作业,吊篮内的人员进行辅助作业;每切割完成一块外墙构件的局部构件后,在卷扬机的驱动下及吊篮内人员的引导下将其向屋顶提升,通过擦窗机轨道传输至顶楼室内和货梯转运出去。本发明提供的高层建筑外墙构件拆除方法实现防止构件跌落“双保险”,拆除过程不对建筑正常运营造成影响。
High-rise building outer wall component dismantling method
The invention provides a high-rise building outer wall component dismantling method which comprises the following steps that a hard protective shed is erected on the first floor of a high-rise building, an existing window cleaning machine on a building roof is used for assisting construction, and a winch is erected on a window cleaning machine rail for assisting hoisting; a steel wire rope of thewinch is lowered to an outer wall component to be dismantled, and constructors on a riding track and/or constructors in a window cleaning machine hanging basket on the outer side of the outer wall component firmly connect the steel wire rope with local components in the outer wall component; the constructors on the riding track perform cutting operation on the local components, and the personnel in the hanging basket perform auxiliary operation; and after each local component of one outer wall component is cut, lifting to the roof under the driving of the winch and the guidance of the personnel in the hanging basket is achieved, and conveying into a top floor room through the window cleaning machine rail and transferring out through a goods elevator are achieved. By means of the high-risebuilding outer wall component dismantling method, double insurance is achieved when the component is prevented from falling off, and normal operation of a building is not affected in the dismantling process.
本发明提供了一种高层建筑外墙构件拆除方法,包括以下步骤:在高层建筑首层搭设硬质防护棚,用建筑屋顶已有的擦窗机辅助施工,并在擦窗机轨道上架设一台卷扬机辅助吊装;将卷扬机的钢丝绳下放到待拆除的外墙构件上,并由马道上的施工人员和/或外墙构件外侧的擦窗机吊篮内的施工人员将钢丝绳与外墙构件中的局部构件牢固连接;马道上的施工人员对局部构件进行切割作业,吊篮内的人员进行辅助作业;每切割完成一块外墙构件的局部构件后,在卷扬机的驱动下及吊篮内人员的引导下将其向屋顶提升,通过擦窗机轨道传输至顶楼室内和货梯转运出去。本发明提供的高层建筑外墙构件拆除方法实现防止构件跌落“双保险”,拆除过程不对建筑正常运营造成影响。
High-rise building outer wall component dismantling method
高层建筑外墙构件的拆除方法
PENG JIANMIN (author) / CHEN HONGMING (author) / PENG YI (author) / XIAO ZIQIANG (author) / LIANG LIANG (author) / GAO YUNPENG (author)
2020-10-09
Patent
Electronic Resource
Chinese