Construction method of suspended ceiling basic layer
The invention provides a construction method of a suspended ceiling basic layer. The method comprises the following steps that 1, construction data are obtained, a construction site is cleared, and surveying and setting out are carried out; 2, positioning and punching are conducted on a top plate, and positioning connecting pieces are installed in all holes; 3, a suspender assembly is connected to the lower portion of each positioning connecting piece; 4, a hoisting basic layer is arranged below each suspender assembly; and 5, each basic layer is coated with anti-rust paint, at least three times. According to the construction method of the suspended ceiling basic layer, by arranging the basic layer, the decoration requirement for a large space can be met, under the condition that safety and durability are guaranteed, high operability is achieved, meanwhile, cross operation is not affected in the construction process, the utilization rate is high, and the construction quality is high.
本申请提供了一种吊顶转换层的施工方法,包括:步骤一,获取施工数据,对施工场地进行清整并测量放线;步骤二,在顶板上进行定位打孔,并在各孔内安装定位连接件;步骤三,在各所述定位连接件下分别连接一吊杆组件;步骤四,在各所述吊杆组件下设置吊装转换层;步骤五,对所述转换层涂刷防锈漆,且至少分三次涂刷。本申请提供的吊顶转换层的施工方法,通过设置转化层,能够满足对大型空间的装饰要求,保证安全性及耐用性的情况下,具有很强的可操作性,同时施工过程中不会影响交叉作业,利用率高,施工质量高。
Construction method of suspended ceiling basic layer
The invention provides a construction method of a suspended ceiling basic layer. The method comprises the following steps that 1, construction data are obtained, a construction site is cleared, and surveying and setting out are carried out; 2, positioning and punching are conducted on a top plate, and positioning connecting pieces are installed in all holes; 3, a suspender assembly is connected to the lower portion of each positioning connecting piece; 4, a hoisting basic layer is arranged below each suspender assembly; and 5, each basic layer is coated with anti-rust paint, at least three times. According to the construction method of the suspended ceiling basic layer, by arranging the basic layer, the decoration requirement for a large space can be met, under the condition that safety and durability are guaranteed, high operability is achieved, meanwhile, cross operation is not affected in the construction process, the utilization rate is high, and the construction quality is high.
本申请提供了一种吊顶转换层的施工方法,包括:步骤一,获取施工数据,对施工场地进行清整并测量放线;步骤二,在顶板上进行定位打孔,并在各孔内安装定位连接件;步骤三,在各所述定位连接件下分别连接一吊杆组件;步骤四,在各所述吊杆组件下设置吊装转换层;步骤五,对所述转换层涂刷防锈漆,且至少分三次涂刷。本申请提供的吊顶转换层的施工方法,通过设置转化层,能够满足对大型空间的装饰要求,保证安全性及耐用性的情况下,具有很强的可操作性,同时施工过程中不会影响交叉作业,利用率高,施工质量高。
Construction method of suspended ceiling basic layer
吊顶转换层施工方法
ZOU ZHOU (author) / BIAN SHUWANG (author) / LI RUGANG (author)
2021-06-18
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
SUSPENDED CEILING STRUCTURE AND SUSPENDED CEILING CONSTRUCTION METHOD
European Patent Office | 2015
|CONSTRUCTION METHOD OF SUSPENDED CEILING AND SUSPENDED CEILING
European Patent Office | 2015
|Construction method for suspended ceiling conversion layer
European Patent Office | 2024
|Suspended ceiling module, suspended ceiling system and construction method thereof
European Patent Office | 2020
|