A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field related to railway construction, in particular to railway ballast replacement equipment. The equipment comprises a vehicle body; a traveling system used for traveling of the device is arranged at the bottom end of the vehicle body, clearing action systems used for clearing railway ballast are symmetrically arranged at the two ends of the vehicle body, and first cavities are formed in the clearing action systems and the vehicle body. The bottom end of the clearing action system is provided with a clearing system used for implementing railway ballast clearing, a second cavity is formed in the clearing system, the bottom end of the vehicle body is provided with a supplementing system used for supplementing railway ballast, a third cavity is formed in the supplementing system, and new railway ballast is stored in the third cavity. The railway ballast clearing equipment can automatically advance on a train track, railway ballasts below the track are replaced in the advancing process, the railway ballasts beside the track and at the bottom of the track are cleared away through the swing device and the sliding device, and new railway ballasts in equipment are cleared away below the track through the intermittent device and then intermittently supplemented.
本发明涉及铁路施工相关的技术领域,具体为一种道砟更换设备。一种道砟更换设备,包括车身,所述车身底端设置有用于该设备行进的行进系统,所述车身两端对称的设置有用于对道砟进行清除动作的清除动作系统,所述清除动作系统和所述车身内设置有第一空腔,所述清除动作系统底端设置有用于实施道砟清除的清除系统,清除系统内设置有第二空腔,车身底端设置有用于补充道砟的补充系统,补充系统内设置有第三空腔,第三空腔内储存有新的道砟;本发明可以火车轨道上进行自动行进,并且在行进过程中轨道下方的道砟进行更换,通过摆动装置和滑动装置实现对轨道旁和轨道底部的道砟进行清除,通过间歇装置将设备内的新道砟在轨道下清楚后进行间歇补充。
The invention relates to the technical field related to railway construction, in particular to railway ballast replacement equipment. The equipment comprises a vehicle body; a traveling system used for traveling of the device is arranged at the bottom end of the vehicle body, clearing action systems used for clearing railway ballast are symmetrically arranged at the two ends of the vehicle body, and first cavities are formed in the clearing action systems and the vehicle body. The bottom end of the clearing action system is provided with a clearing system used for implementing railway ballast clearing, a second cavity is formed in the clearing system, the bottom end of the vehicle body is provided with a supplementing system used for supplementing railway ballast, a third cavity is formed in the supplementing system, and new railway ballast is stored in the third cavity. The railway ballast clearing equipment can automatically advance on a train track, railway ballasts below the track are replaced in the advancing process, the railway ballasts beside the track and at the bottom of the track are cleared away through the swing device and the sliding device, and new railway ballasts in equipment are cleared away below the track through the intermittent device and then intermittently supplemented.
本发明涉及铁路施工相关的技术领域,具体为一种道砟更换设备。一种道砟更换设备,包括车身,所述车身底端设置有用于该设备行进的行进系统,所述车身两端对称的设置有用于对道砟进行清除动作的清除动作系统,所述清除动作系统和所述车身内设置有第一空腔,所述清除动作系统底端设置有用于实施道砟清除的清除系统,清除系统内设置有第二空腔,车身底端设置有用于补充道砟的补充系统,补充系统内设置有第三空腔,第三空腔内储存有新的道砟;本发明可以火车轨道上进行自动行进,并且在行进过程中轨道下方的道砟进行更换,通过摆动装置和滑动装置实现对轨道旁和轨道底部的道砟进行清除,通过间歇装置将设备内的新道砟在轨道下清楚后进行间歇补充。
Railway ballast replacement equipment
一种道砟更换设备
CHEN CHENG (author)
2021-06-22
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Railway ballast cleaning equipment and railway ballast cleaning method
European Patent Office | 2023
|Railway ballast excavating device and railway ballast excavating equipment
European Patent Office | 2021
|Multifunctional machine for railway sleeper replacement and ballast digging
European Patent Office | 2020
|