A platform for research: civil engineering, architecture and urbanism
Full tailing slurry filling mold bag solidified body dam stacking process
The invention discloses a full tailing slurry filling mold bag solidified body dam stacking process, and relates to the technical field of mold bag dam stacking. The full tailing slurry filling mold bag solidified body dam stacking process comprises the steps of dam type structure type selection, slurry making, three-dimensional drainage system construction, mold bag type selection, mold bag body arrangement, mold bag body fixation, mold bag body filling, manual drainage and the like. The full tailing slurry filling mold bag solidified body dam stacking process used as a novel technology for achieving tailing pond full tailing slurry dam stacking is an iteration and innovation of an existing mold bag damming mode, the damming process is simple and convenient, the mode is fast, the formed dam body is low in infiltration line, and the dam body is high in stability and safety. In addition, tailings particles of -200 meshes to -400 meshes can be stockpiled and treated through the formed filling mold bag solidification dam body, a three-dimensional drainage system is formed in the dam body through staggered and staggered-layer arrangement of the mold bag solidification bodies, rapid drainage of the mold bag solidification bodies can be achieved, and practicability is high.
本发明公开一种全尾矿浆冲填模袋固化体堆坝工艺,涉及模袋堆坝技术领域,包括坝型结构选型、造浆、构造三维立体排水系统、模袋选型、模袋体布置、模袋体固定、模袋体冲填、人工排水等工序,该工艺作为实现尾矿库全尾矿浆堆坝的新型技术,是以往模袋筑坝方式的迭代和创新,不仅筑坝工艺简便、方式快,而且形成的坝体浸润线低,坝体稳定性高,安全性高。此外,本发明所形成的冲填模袋固化坝体可堆存处理‑200~‑400目尾砂颗粒,且坝体内通过模袋固化体错位、错层布置形成有三维立体排水系统,有利于实现模袋固化体迅速排水,实用性强。
Full tailing slurry filling mold bag solidified body dam stacking process
The invention discloses a full tailing slurry filling mold bag solidified body dam stacking process, and relates to the technical field of mold bag dam stacking. The full tailing slurry filling mold bag solidified body dam stacking process comprises the steps of dam type structure type selection, slurry making, three-dimensional drainage system construction, mold bag type selection, mold bag body arrangement, mold bag body fixation, mold bag body filling, manual drainage and the like. The full tailing slurry filling mold bag solidified body dam stacking process used as a novel technology for achieving tailing pond full tailing slurry dam stacking is an iteration and innovation of an existing mold bag damming mode, the damming process is simple and convenient, the mode is fast, the formed dam body is low in infiltration line, and the dam body is high in stability and safety. In addition, tailings particles of -200 meshes to -400 meshes can be stockpiled and treated through the formed filling mold bag solidification dam body, a three-dimensional drainage system is formed in the dam body through staggered and staggered-layer arrangement of the mold bag solidification bodies, rapid drainage of the mold bag solidification bodies can be achieved, and practicability is high.
本发明公开一种全尾矿浆冲填模袋固化体堆坝工艺,涉及模袋堆坝技术领域,包括坝型结构选型、造浆、构造三维立体排水系统、模袋选型、模袋体布置、模袋体固定、模袋体冲填、人工排水等工序,该工艺作为实现尾矿库全尾矿浆堆坝的新型技术,是以往模袋筑坝方式的迭代和创新,不仅筑坝工艺简便、方式快,而且形成的坝体浸润线低,坝体稳定性高,安全性高。此外,本发明所形成的冲填模袋固化坝体可堆存处理‑200~‑400目尾砂颗粒,且坝体内通过模袋固化体错位、错层布置形成有三维立体排水系统,有利于实现模袋固化体迅速排水,实用性强。
Full tailing slurry filling mold bag solidified body dam stacking process
一种全尾矿浆冲填模袋固化体堆坝工艺
DAI XIANQING (author) / ZHOU BING (author) / YAO JINFU (author) / CAO YING (author) / JIANG JIANPING (author) / MAO XIAOBING (author) / GAO PENG (author)
2021-06-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cement admixture for full tailing filling, preparation method and filling slurry
European Patent Office | 2022
|Tailing pond dam body, tailing pond and stacking method of tailing pond dam body
European Patent Office | 2023
|Novel tailing cementitious material for metal mine full-tailing filling
European Patent Office | 2020
|Mine tailing filling additive and preparation method thereof, filling material and filling slurry
European Patent Office | 2021
|