A platform for research: civil engineering, architecture and urbanism
Segment field track construction platform car
The invention discloses a segment field track construction platform car. The segment field track construction platform car comprises a foundation and a top wall, wherein a plurality of partition walls are fixedly connected between the opposite faces of the foundation and the top wall, a construction area is formed among the foundation, the partition walls and the top wall, an equipment cavity is formed in the bottom of the foundation, and cushion blocks are fixedly installed at the positions, located on the two sides of the equipment cavity, of the top of the foundation. According to the segment field track construction platform car, a lifting structure is mechanically pushed to transversely move, then the working area where workers are located is adjusted, the position of a construction frame structure does not need to be manually adjusted after work of each working area is completed, the workers can continuously work, the working efficiency is further improved, and therefore the construction progress can be accelerated; and sliding limiting is carried out on the lifting structure from the side face and the bottom of the lifting structure, position deviation can be prevented when an original plate transversely moves, the running stability of the device is guaranteed, and the use safety of the construction platform car is improved.
本发明公开了一种段场轨道施工平台车,包括地基与顶墙,地基与顶墙的相对面之间固定连接有若干隔墙,地基、隔墙与顶墙之间形成有施工区域,地基的底部开设有设备腔,地基的顶部且位于设备腔的两侧均固定安装有垫块。该段场轨道施工平台车,实现了机械化的推动升降结构进行横向移动,进而实现对工作人员所处于的工作区域进行调整,无需每段工作区域工作完成后,人工的对施工架结构的位置进行调整,使的工作人员可持续性进行工作,进一步的提高了工作效率,从而有利于加快施工进度,且从升降结构的侧面和底部均对其进行滑动限位,有助于防止原板在进行横向移动的时候,出现位置偏移,保证了装置运行的稳定性,也提高了施工平台车使用的安全性。
Segment field track construction platform car
The invention discloses a segment field track construction platform car. The segment field track construction platform car comprises a foundation and a top wall, wherein a plurality of partition walls are fixedly connected between the opposite faces of the foundation and the top wall, a construction area is formed among the foundation, the partition walls and the top wall, an equipment cavity is formed in the bottom of the foundation, and cushion blocks are fixedly installed at the positions, located on the two sides of the equipment cavity, of the top of the foundation. According to the segment field track construction platform car, a lifting structure is mechanically pushed to transversely move, then the working area where workers are located is adjusted, the position of a construction frame structure does not need to be manually adjusted after work of each working area is completed, the workers can continuously work, the working efficiency is further improved, and therefore the construction progress can be accelerated; and sliding limiting is carried out on the lifting structure from the side face and the bottom of the lifting structure, position deviation can be prevented when an original plate transversely moves, the running stability of the device is guaranteed, and the use safety of the construction platform car is improved.
本发明公开了一种段场轨道施工平台车,包括地基与顶墙,地基与顶墙的相对面之间固定连接有若干隔墙,地基、隔墙与顶墙之间形成有施工区域,地基的底部开设有设备腔,地基的顶部且位于设备腔的两侧均固定安装有垫块。该段场轨道施工平台车,实现了机械化的推动升降结构进行横向移动,进而实现对工作人员所处于的工作区域进行调整,无需每段工作区域工作完成后,人工的对施工架结构的位置进行调整,使的工作人员可持续性进行工作,进一步的提高了工作效率,从而有利于加快施工进度,且从升降结构的侧面和底部均对其进行滑动限位,有助于防止原板在进行横向移动的时候,出现位置偏移,保证了装置运行的稳定性,也提高了施工平台车使用的安全性。
Segment field track construction platform car
段场轨道施工平台车
YANG ZHIHONG (author) / REN YULONG (author) / LIU QIANRONG (author) / HE YANYUN (author) / LI YAOFENG (author) / WANG LIFENG (author) / GAO YU (author)
2021-06-22
Patent
Electronic Resource
Chinese
METHOD FOR ASSEMBLING TRACK SEGMENT, JIG, TRACK SEGMENT, AND TRACK
European Patent Office | 2024
|European Patent Office | 2021
|Engineering Index Backfile | 1898
|