The invention relates to the technical field of building formwork, and discloses a building formwork construction wall. The building formwork construction wall comprises two pieces of channel steel, screws, inner tops, round holes, screw holes and through holes. The two pieces of channel steel are oppositely distributed in the left-right direction, the multiple screw holes are correspondingly formed in the opposite sides of the two pieces of channel steel, and the inner tops are placed between the two pieces of channel steel; the through holes are integrally formed in the inner tops, and the screws penetrate through the through holes; and the two ends of the screws extend to one side of the channel steel, and the screws are in threaded connection with the screw holes. The channel steel is selected as a main element of the wall, the channel steel can meet the corrosion resistance and can be connected left and right, a formwork is installed on the wall, and the formwork can be corrected as long as the wall is corrected; and according to the requirement for convenient installation and disassembly, a screw connection method is selected, and a traditional iron nail connection method is low in efficiency, difficult in nail installation and more difficult in disassembly.
本发明涉及建筑模板技术领域,且公开了一种建筑模板施工墙和,包括槽钢、螺丝钉、内顶、圆孔、螺丝孔和通孔,所述槽钢的数量为两个,两个所述槽钢左右相对分布,两个所述槽钢的相对侧分别开设多个所述螺丝孔,两个所述槽钢之间放置有所述内顶,所述内顶的内部一体成型有所述通孔,所述通孔的内部贯穿有所述螺丝钉,且所述螺丝钉的两端延伸至所述槽钢的一侧,并且所述螺丝钉与所述螺丝孔螺纹连接;本发明中选用槽钢作为墙和的主体元件,槽钢能满足抗腐蚀性,可以左右连接,由于模板安装在墙和身上,因而只要校正了墙和,就校正了模板;根据安装和拆卸方便的要求,选用螺丝钉连接方法,传统的铁钉连接法效率低,装钉艰难,拆除更艰难。
The invention relates to the technical field of building formwork, and discloses a building formwork construction wall. The building formwork construction wall comprises two pieces of channel steel, screws, inner tops, round holes, screw holes and through holes. The two pieces of channel steel are oppositely distributed in the left-right direction, the multiple screw holes are correspondingly formed in the opposite sides of the two pieces of channel steel, and the inner tops are placed between the two pieces of channel steel; the through holes are integrally formed in the inner tops, and the screws penetrate through the through holes; and the two ends of the screws extend to one side of the channel steel, and the screws are in threaded connection with the screw holes. The channel steel is selected as a main element of the wall, the channel steel can meet the corrosion resistance and can be connected left and right, a formwork is installed on the wall, and the formwork can be corrected as long as the wall is corrected; and according to the requirement for convenient installation and disassembly, a screw connection method is selected, and a traditional iron nail connection method is low in efficiency, difficult in nail installation and more difficult in disassembly.
本发明涉及建筑模板技术领域,且公开了一种建筑模板施工墙和,包括槽钢、螺丝钉、内顶、圆孔、螺丝孔和通孔,所述槽钢的数量为两个,两个所述槽钢左右相对分布,两个所述槽钢的相对侧分别开设多个所述螺丝孔,两个所述槽钢之间放置有所述内顶,所述内顶的内部一体成型有所述通孔,所述通孔的内部贯穿有所述螺丝钉,且所述螺丝钉的两端延伸至所述槽钢的一侧,并且所述螺丝钉与所述螺丝孔螺纹连接;本发明中选用槽钢作为墙和的主体元件,槽钢能满足抗腐蚀性,可以左右连接,由于模板安装在墙和身上,因而只要校正了墙和,就校正了模板;根据安装和拆卸方便的要求,选用螺丝钉连接方法,传统的铁钉连接法效率低,装钉艰难,拆除更艰难。
Building formwork construction wall
一种建筑模板施工墙和
YANG YUANDONG (author)
2021-06-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|Wall formwork for modular building and construction method
European Patent Office | 2024
|Formwork structure at deformation joint, formwork and construction method of building outer wall
European Patent Office | 2023
|