A platform for research: civil engineering, architecture and urbanism
Wall formwork for modular building and construction method
The invention relates to a wall formwork for a modular building and a construction method. The wall formwork comprises a first formwork body and a second formwork body which are arranged in parallel in a spaced mode. The reinforcement cage is installed between the first formwork and the second formwork in parallel, one side of the reinforcement cage is connected with the first formwork, and the other side of the reinforcement cage is connected with the second formwork; the opposite-pulling devices are used for connecting the first formwork and the second formwork, the opposite-pulling devices are arranged in the extending direction perpendicular to the first formwork, one ends of the opposite-pulling devices are connected with the first formwork, the other ends of the opposite-pulling devices are connected with the second formwork, and the opposite-pulling devices are connected with the reinforcement cage. The reinforcement cage is installed between the first formwork and the second formwork to increase the strength of the wall formwork for the modular building, when the wall formwork for the modular building is used for assembling a house for construction, the reinforcement cage does not need to be bound on site, the problem that the reinforcement cage is difficult to bind on site is solved, site construction procedures are reduced, the construction progress is accelerated, and the construction efficiency is improved. The construction efficiency is improved.
本发明涉及一种模块化建筑用墙模及施工方法,包括:平行间隔布置的第一模板和第二模板;钢筋笼,平行安装于第一模板与第二模板之间,钢筋笼的一侧与第一模板连接,另一侧与第二模板连接;多个对拉装置,用于连接第一模板和第二模板,对拉装置沿垂直于第一模板的延伸方向布置,对拉装置的一端与第一模板连接,另一端与第二模板连接,对拉装置与钢筋笼连接。本发明通过将钢筋笼安装于第一模板和第二模板之间,以增加该模块化建筑用墙模的强度,使用该模块化建筑用墙模组装房屋施工时,不再需要现场绑扎钢筋笼,解决现场绑扎钢筋笼困难的问题,减少现场施工工序,加快施工进度,提高施工效率。
Wall formwork for modular building and construction method
The invention relates to a wall formwork for a modular building and a construction method. The wall formwork comprises a first formwork body and a second formwork body which are arranged in parallel in a spaced mode. The reinforcement cage is installed between the first formwork and the second formwork in parallel, one side of the reinforcement cage is connected with the first formwork, and the other side of the reinforcement cage is connected with the second formwork; the opposite-pulling devices are used for connecting the first formwork and the second formwork, the opposite-pulling devices are arranged in the extending direction perpendicular to the first formwork, one ends of the opposite-pulling devices are connected with the first formwork, the other ends of the opposite-pulling devices are connected with the second formwork, and the opposite-pulling devices are connected with the reinforcement cage. The reinforcement cage is installed between the first formwork and the second formwork to increase the strength of the wall formwork for the modular building, when the wall formwork for the modular building is used for assembling a house for construction, the reinforcement cage does not need to be bound on site, the problem that the reinforcement cage is difficult to bind on site is solved, site construction procedures are reduced, the construction progress is accelerated, and the construction efficiency is improved. The construction efficiency is improved.
本发明涉及一种模块化建筑用墙模及施工方法,包括:平行间隔布置的第一模板和第二模板;钢筋笼,平行安装于第一模板与第二模板之间,钢筋笼的一侧与第一模板连接,另一侧与第二模板连接;多个对拉装置,用于连接第一模板和第二模板,对拉装置沿垂直于第一模板的延伸方向布置,对拉装置的一端与第一模板连接,另一端与第二模板连接,对拉装置与钢筋笼连接。本发明通过将钢筋笼安装于第一模板和第二模板之间,以增加该模块化建筑用墙模的强度,使用该模块化建筑用墙模组装房屋施工时,不再需要现场绑扎钢筋笼,解决现场绑扎钢筋笼困难的问题,减少现场施工工序,加快施工进度,提高施工效率。
Wall formwork for modular building and construction method
一种模块化建筑用墙模及施工方法
MENG HUI (author) / ZHAO BAOJUN (author) / ZHANG ZONGJUN (author) / WANG QIONG (author) / ZHOU BIAO (author) / YAN CHEN (author) / LI CHAO (author) / CHEN JUNSONG (author) / YE HONG (author)
2024-11-01
Patent
Electronic Resource
Chinese
L-shaped wall formwork for modular building and construction method
European Patent Office | 2024
|T-shaped wall formwork for modular building and construction method
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2024
|