A platform for research: civil engineering, architecture and urbanism
Hanging formwork construction method
The invention relates to the technical field of concrete construction, and particularly relates to a hanging formwork construction method. The hanging formwork construction method comprises the following steps that S1, material selection is conducted, specifically, square steel is adopted as a raw material; S2, cutting and blanking are conducted, specifically, the length of a formwork supporting frame is determined according to the size of a construction site, and thus cutting and blanking are conducted; S3, plug pin manufacturing is conducted, specifically, a guide rail is welded to the top end of a connecting part, a plug pin is manufactured, the guide rail and the plug pin are arranged in a matched mode, and the plug pin can be inserted into the guide rail and horizontally moves; S4, connecting is conducted, specifically, the square steel cut and formed in the step S2 is spliced; S5, fixing is conducted, specifically, a spliced and formed formwork is mounted in place and fixed; S6, correcting is conducted, specifically, the flatness and elevation of the formwork are corrected; S7, concrete pouring is conducted, specifically, concrete is poured into the formwork; and S8, formwork removing is conducted, specifically, after the concrete is solidified, the formwork is removed. The problems that according to a traditional hanging formwork construction method, a formwork is integral, integral moving is needed, and the efficiency is low are solved. The hanging formwork construction method is mainly used for hanging formwork construction.
本发明涉及混凝土施工技术领域,更具体而言,涉及一种吊模施工方法。包括如下步骤:S1选材:采用方钢作为原材料;S2:切割下料:根据施工地的尺寸确定模具支撑框的长度从而进行切割下料;S3:插销制作:在连接部位的顶端焊接导轨,并制作插销,所述导轨和插销匹配设置,所述插销能够插入导轨内部并进行水平移动;S4:连接:对步骤S2中切割成型的方钢进行拼接;S5:固定:将拼装成型的模具安装到位,并进行固定;S6:校正:对模具平整度及标高进行校正;S7:混凝土浇筑:将混凝土浇筑到模具中;S8:拆模:待混凝土凝固后,拆除模板。本发明解决了传统吊模施工方法的的模具为整体,需要整体移动,效率低下的问题。本发明主要用于吊模施工。
Hanging formwork construction method
The invention relates to the technical field of concrete construction, and particularly relates to a hanging formwork construction method. The hanging formwork construction method comprises the following steps that S1, material selection is conducted, specifically, square steel is adopted as a raw material; S2, cutting and blanking are conducted, specifically, the length of a formwork supporting frame is determined according to the size of a construction site, and thus cutting and blanking are conducted; S3, plug pin manufacturing is conducted, specifically, a guide rail is welded to the top end of a connecting part, a plug pin is manufactured, the guide rail and the plug pin are arranged in a matched mode, and the plug pin can be inserted into the guide rail and horizontally moves; S4, connecting is conducted, specifically, the square steel cut and formed in the step S2 is spliced; S5, fixing is conducted, specifically, a spliced and formed formwork is mounted in place and fixed; S6, correcting is conducted, specifically, the flatness and elevation of the formwork are corrected; S7, concrete pouring is conducted, specifically, concrete is poured into the formwork; and S8, formwork removing is conducted, specifically, after the concrete is solidified, the formwork is removed. The problems that according to a traditional hanging formwork construction method, a formwork is integral, integral moving is needed, and the efficiency is low are solved. The hanging formwork construction method is mainly used for hanging formwork construction.
本发明涉及混凝土施工技术领域,更具体而言,涉及一种吊模施工方法。包括如下步骤:S1选材:采用方钢作为原材料;S2:切割下料:根据施工地的尺寸确定模具支撑框的长度从而进行切割下料;S3:插销制作:在连接部位的顶端焊接导轨,并制作插销,所述导轨和插销匹配设置,所述插销能够插入导轨内部并进行水平移动;S4:连接:对步骤S2中切割成型的方钢进行拼接;S5:固定:将拼装成型的模具安装到位,并进行固定;S6:校正:对模具平整度及标高进行校正;S7:混凝土浇筑:将混凝土浇筑到模具中;S8:拆模:待混凝土凝固后,拆除模板。本发明解决了传统吊模施工方法的的模具为整体,需要整体移动,效率低下的问题。本发明主要用于吊模施工。
Hanging formwork construction method
一种吊模施工方法
GUO HUA (author) / WANG SHENGTIAN (author) / ZHANG KAI (author) / WU PENG (author) / LIU HAICHAO (author) / FAN YANJUN (author) / ZHANG GUODONG (author)
2021-06-25
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Roof formwork erecting construction method and formwork hanging system
European Patent Office | 2024
|Waterproof construction hanging formwork and waterproof construction method
European Patent Office | 2021
|Reverse hanging formwork and construction method thereof
European Patent Office | 2023
|Hanging bracket construction method for removing bottom formwork
European Patent Office | 2022
|