A platform for research: civil engineering, architecture and urbanism
Construction method of connecting structure of partially-filled steel tube concrete pier with self-resetting function and foundation
The invention relates to the field of bridge engineering, in particular to a construction method of a connecting structure of a partially-filled steel tube concrete pier with a self-resetting function and a foundation. According to the technical scheme, the method comprises the following steps: 1, a concrete bearing platform is poured; 2, a steel pipe and a perforated plate are mounted; and 3, prestressed steel strands and prestressed steel bars are tensioned. According to the construction method of the connecting structure of the partially-filled steel tube concrete pier with the self-resetting function and the foundation, the connecting structure has enough bearing capacity and also has the self-resetting capacity.
本发明涉及桥梁工程领域,具体涉及一种具有自复位功能的部分填充钢管混凝土桥墩与基础的连接结构的施工方法。技术方案如下:包括如下步骤:步骤一:浇筑混凝土承台;步骤二:安装钢管和带孔板;步骤三:张拉预应力钢绞线和预应力钢筋。本发明提供的具有自复位功能的部分填充钢管混凝土桥墩与基础的连接结构的施工方法,该连接结构既有足够的承载力,也有自复位能力。
Construction method of connecting structure of partially-filled steel tube concrete pier with self-resetting function and foundation
The invention relates to the field of bridge engineering, in particular to a construction method of a connecting structure of a partially-filled steel tube concrete pier with a self-resetting function and a foundation. According to the technical scheme, the method comprises the following steps: 1, a concrete bearing platform is poured; 2, a steel pipe and a perforated plate are mounted; and 3, prestressed steel strands and prestressed steel bars are tensioned. According to the construction method of the connecting structure of the partially-filled steel tube concrete pier with the self-resetting function and the foundation, the connecting structure has enough bearing capacity and also has the self-resetting capacity.
本发明涉及桥梁工程领域,具体涉及一种具有自复位功能的部分填充钢管混凝土桥墩与基础的连接结构的施工方法。技术方案如下:包括如下步骤:步骤一:浇筑混凝土承台;步骤二:安装钢管和带孔板;步骤三:张拉预应力钢绞线和预应力钢筋。本发明提供的具有自复位功能的部分填充钢管混凝土桥墩与基础的连接结构的施工方法,该连接结构既有足够的承载力,也有自复位能力。
Construction method of connecting structure of partially-filled steel tube concrete pier with self-resetting function and foundation
具有自复位功能的部分填充钢管混凝土桥墩与基础的连接结构的施工方法
MA YUE (author) / FU MINGCHUN (author) / LIU YING (author) / YU FENGLUN (author) / WANG ZHANFEI (author)
2021-06-29
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|European Patent Office | 2020
|European Patent Office | 2021
|Self-resetting hollow interlayer concrete-filled steel tube section assembled bridge pier
European Patent Office | 2021
|