A platform for research: civil engineering, architecture and urbanism
Rapid piling equipment for building engineering construction
The invention discloses rapid piling equipment for building engineering construction, and relates to the technical field of rapid piling. The rapid piling equipment comprises a piling machine and a pile control assembly, and the piling machine is at least provided with a hammer body capable of reciprocating; the pile control assembly at least comprises a first pile control cylinder and a second pile control cylinder which are connected in sequence, and the first pile control cylinder and the second pile control cylinder are connected in a mode that the angle can be finely adjusted; a reaming head is coaxially arranged below a bottom pile, and when the reaming head is fed into the bottom pile, the pile control assembly is arranged on the bottom pile in advance; and when extension piles are fed, the first pile control cylinder tightly holds the extension piles, and the second pile control cylinder tightly holds the bottom pile or the extension piles and is used for finely adjusting the angle between the extension pile and the bottom pile or the angle between the extension piles.
本发明公开了一种建筑工程施工快速打桩设备,涉及快速打桩技术领域,包括:打桩机,至少具有能够进行往返运动的锤体;以及控桩组件,所述控桩组件至少包括依次相连的第一控桩筒和第二控桩筒,且所述第一控桩筒与所述第二控桩筒之间可微调角度的相连;所述底桩下方同轴设置有扩孔头,且当送入底桩时,所述控桩组件预置于所述底桩上;当送入延长桩时,所述第一控桩筒抱紧在延长桩上,所述第二控桩筒抱紧在所述底桩上或延长桩上,用于微调所述延长桩与底桩之间或者延长桩与延长桩之间的角度。
Rapid piling equipment for building engineering construction
The invention discloses rapid piling equipment for building engineering construction, and relates to the technical field of rapid piling. The rapid piling equipment comprises a piling machine and a pile control assembly, and the piling machine is at least provided with a hammer body capable of reciprocating; the pile control assembly at least comprises a first pile control cylinder and a second pile control cylinder which are connected in sequence, and the first pile control cylinder and the second pile control cylinder are connected in a mode that the angle can be finely adjusted; a reaming head is coaxially arranged below a bottom pile, and when the reaming head is fed into the bottom pile, the pile control assembly is arranged on the bottom pile in advance; and when extension piles are fed, the first pile control cylinder tightly holds the extension piles, and the second pile control cylinder tightly holds the bottom pile or the extension piles and is used for finely adjusting the angle between the extension pile and the bottom pile or the angle between the extension piles.
本发明公开了一种建筑工程施工快速打桩设备,涉及快速打桩技术领域,包括:打桩机,至少具有能够进行往返运动的锤体;以及控桩组件,所述控桩组件至少包括依次相连的第一控桩筒和第二控桩筒,且所述第一控桩筒与所述第二控桩筒之间可微调角度的相连;所述底桩下方同轴设置有扩孔头,且当送入底桩时,所述控桩组件预置于所述底桩上;当送入延长桩时,所述第一控桩筒抱紧在延长桩上,所述第二控桩筒抱紧在所述底桩上或延长桩上,用于微调所述延长桩与底桩之间或者延长桩与延长桩之间的角度。
Rapid piling equipment for building engineering construction
一种建筑工程施工快速打桩设备
LIU GUOQIANG (author) / CHEN HONG (author)
2021-06-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rapid piling equipment for building engineering construction
European Patent Office | 2022
|Rapid piling device for building engineering construction
European Patent Office | 2023
|Civil engineering piling mechanism and house building construction equipment
European Patent Office | 2022
|Civil engineering piling mechanism and house building construction equipment
European Patent Office | 2024
|