A platform for research: civil engineering, architecture and urbanism
Rapid piling equipment for building engineering construction
The invention relates to piling equipment, in particular to rapid piling equipment for building engineering construction. According to the rapid piling equipment for building engineering construction, the position of a pile can be positioned, and then the piling position can be prevented from deviating. Rapid piling equipment for building engineering construction comprises universal wheels, a base, an operation room, a guide seat and the like, the universal wheels are rotationally connected to the front side and the rear side of the bottom of the base, the operation room is connected to the upper side of the rear portion of the base, and the guide seat is bolted to the upper side of the front portion of the base. According to the piling equipment, the equipment can be fixed and limited through the fixing seat during piling, so that the equipment can be prevented from moving during piling, and a first arc-shaped alignment plate can position a pile, so that the position of the pile can be prevented from deviating.
本发明涉及一种打桩设备,尤其涉及一种建筑工程施工快速打桩设备。提供一种能够对桩子位置进行定位,进而能够防止打桩位置发生偏移的建筑工程施工快速打桩设备。一种建筑工程施工快速打桩设备,包括有万向轮、底座、操作室和导向座等,底座底部前后两侧均转动式连接有万向轮,底座后部上侧连接有操作室,底座前部上侧栓接有导向座。本发明通过固定座能够在本设备打桩时对其进行固定限位,从而能够防止本设备在打桩时发生移动,并且第一弧形对位板能够对桩子进行定位,从而能够防止桩子位置发生偏移。
Rapid piling equipment for building engineering construction
The invention relates to piling equipment, in particular to rapid piling equipment for building engineering construction. According to the rapid piling equipment for building engineering construction, the position of a pile can be positioned, and then the piling position can be prevented from deviating. Rapid piling equipment for building engineering construction comprises universal wheels, a base, an operation room, a guide seat and the like, the universal wheels are rotationally connected to the front side and the rear side of the bottom of the base, the operation room is connected to the upper side of the rear portion of the base, and the guide seat is bolted to the upper side of the front portion of the base. According to the piling equipment, the equipment can be fixed and limited through the fixing seat during piling, so that the equipment can be prevented from moving during piling, and a first arc-shaped alignment plate can position a pile, so that the position of the pile can be prevented from deviating.
本发明涉及一种打桩设备,尤其涉及一种建筑工程施工快速打桩设备。提供一种能够对桩子位置进行定位,进而能够防止打桩位置发生偏移的建筑工程施工快速打桩设备。一种建筑工程施工快速打桩设备,包括有万向轮、底座、操作室和导向座等,底座底部前后两侧均转动式连接有万向轮,底座后部上侧连接有操作室,底座前部上侧栓接有导向座。本发明通过固定座能够在本设备打桩时对其进行固定限位,从而能够防止本设备在打桩时发生移动,并且第一弧形对位板能够对桩子进行定位,从而能够防止桩子位置发生偏移。
Rapid piling equipment for building engineering construction
一种建筑工程施工快速打桩设备
ZHU QINGLONG (author) / ZHAO QILIANG (author) / YAN YANYAN (author)
2022-07-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rapid piling equipment for building engineering construction
European Patent Office | 2021
|Rapid piling device for building engineering construction
European Patent Office | 2023
|Civil engineering piling mechanism and house building construction equipment
European Patent Office | 2022
|Civil engineering piling mechanism and house building construction equipment
European Patent Office | 2024
|