A platform for research: civil engineering, architecture and urbanism
Manual hole digging pile concrete protection wall pouring construction system and construction method thereof
The invention discloses a manual hole digging pile concrete protection wall pouring construction system and a construction method thereof, and belongs to the technical field of manual hole digging pile construction. The manual hole digging pile concrete protection wall pouring construction system comprises a hopper, wherein a connecting buckle and a guide pipe are arranged at the bottom of the hopper, a customized guide pipe is arranged at the bottom of the guide pipe, a hole is formed in the outer ring of the customized guide pipe, a concrete flow divider and a shaping steel protection cylinder are arranged at the bottom of the customized guide pipe, and the concrete flow divider is composed of a first circular-truncated-cone-shaped steel protection wall, a second circular-truncated-cone-shaped steel protection wall and a spherical surface-shaped customized steel plate. According to the manual hole digging pile concrete protection wall pouring construction system and the construction method thereof, the construction rhythm is fast, the concrete pouring process is continuous, the construction steps are simplified, the concrete pouring period is greatly shortened, the concrete pouring forming quality is improved, tool mounting and dismounting are convenient and fast, the turnover materials can be repeatedly used, the utilization rate is increased, the steel protection cylinder and the concrete flow divider are customized to leave a factory, light-weight operation is achieved, and meanwhile the construction safety risk is reduced.
本发明公开了一种人工挖孔桩混凝土护壁浇筑施工体系及其施工方法,属于人工挖孔桩施工技术领域。本发明包括料斗,所述的料斗的底部设置有连接扣和导管,所述的导管的底部设置有定制导管,定制导管的外圈开设有洞口,定制导管的底部设置有混凝土分流器及定型钢护筒,所述的混凝土分流器由第一圆台形钢护壁、第二圆台形钢护壁和球面形定制钢板组成。本发明施工节奏快,混凝土浇筑过程连续性,简化施工步骤,大大减少了混凝土浇筑周期,提高混凝土浇筑成型质量,工具安装和拆除方便快捷,周转材料可重复使用,提高使用率,钢护筒及混凝土分流器均为定制出厂,轻量化操作,同时减少施工安全风险。
Manual hole digging pile concrete protection wall pouring construction system and construction method thereof
The invention discloses a manual hole digging pile concrete protection wall pouring construction system and a construction method thereof, and belongs to the technical field of manual hole digging pile construction. The manual hole digging pile concrete protection wall pouring construction system comprises a hopper, wherein a connecting buckle and a guide pipe are arranged at the bottom of the hopper, a customized guide pipe is arranged at the bottom of the guide pipe, a hole is formed in the outer ring of the customized guide pipe, a concrete flow divider and a shaping steel protection cylinder are arranged at the bottom of the customized guide pipe, and the concrete flow divider is composed of a first circular-truncated-cone-shaped steel protection wall, a second circular-truncated-cone-shaped steel protection wall and a spherical surface-shaped customized steel plate. According to the manual hole digging pile concrete protection wall pouring construction system and the construction method thereof, the construction rhythm is fast, the concrete pouring process is continuous, the construction steps are simplified, the concrete pouring period is greatly shortened, the concrete pouring forming quality is improved, tool mounting and dismounting are convenient and fast, the turnover materials can be repeatedly used, the utilization rate is increased, the steel protection cylinder and the concrete flow divider are customized to leave a factory, light-weight operation is achieved, and meanwhile the construction safety risk is reduced.
本发明公开了一种人工挖孔桩混凝土护壁浇筑施工体系及其施工方法,属于人工挖孔桩施工技术领域。本发明包括料斗,所述的料斗的底部设置有连接扣和导管,所述的导管的底部设置有定制导管,定制导管的外圈开设有洞口,定制导管的底部设置有混凝土分流器及定型钢护筒,所述的混凝土分流器由第一圆台形钢护壁、第二圆台形钢护壁和球面形定制钢板组成。本发明施工节奏快,混凝土浇筑过程连续性,简化施工步骤,大大减少了混凝土浇筑周期,提高混凝土浇筑成型质量,工具安装和拆除方便快捷,周转材料可重复使用,提高使用率,钢护筒及混凝土分流器均为定制出厂,轻量化操作,同时减少施工安全风险。
Manual hole digging pile concrete protection wall pouring construction system and construction method thereof
一种人工挖孔桩混凝土护壁浇筑施工体系及其施工方法
CHEN LONG (author) / LIU ZHONGZHENG (author)
2021-06-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Manual hole digging pile prefabricated protection wall and construction method thereof
European Patent Office | 2021
|Manual hole digging pile structure and digging pile pouring method
European Patent Office | 2020
|Construction method of manual hole digging pile and manual hole digging pile
European Patent Office | 2021
|Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|