A platform for research: civil engineering, architecture and urbanism
Building structure hole plugging device and method
The invention relates to the technical field of building construction, in particular to a building structure hole plugging device and method. The building structure hole plugging device comprises an umbrella-shaped plugging device assembly, a reference part, a positioning rod and a limiting part, the umbrella-shaped plugging device assembly is inverted and then stretches into a hole from an upper end opening of the hole, and an umbrella stand is located below a building structure; then the reference part and the positioning rod sequentially sleeve the umbrella handle, and the positioning rod is erected at the top of the hole; then, upward force is applied to the umbrella handle, when the umbrella stand is completely unfolded, the umbrella handle is fixed to the positioning rod through the limiting part, and at the moment, the reference part is located at the lower end opening of the hole; the hole is filled with a plugging material; and the building structure hole can be plugged. The building structure hole plugging operation is simple and convenient, and the time cost and the labor cost are reduced; and in addition, the building structure hole plugging device is low in manufacturing cost, convenient to construct, capable of being recycled and high in practicability.
本发明涉及建筑施工技术领域,尤其涉及一种建筑结构孔洞封堵装置及封堵方法,包括伞状封堵装置组件、基准件、定位杆和限位件,通过将伞状封堵装置组件倒置后从孔洞的上端口伸入孔洞,使得伞架位于建筑结构的下方;之后依次于伞柄上套设基准件和定位杆,且将定位杆架设于孔洞的顶部;然后对伞柄施加向上的力,并在伞架完全撑开时,利用限位件将伞柄固定在定位杆上,此时基准件位于孔洞的下端口;之后向所述孔洞填充封堵材料;从而能完成建筑结构孔洞的封堵,且该建筑结构孔洞封堵操作简便,降低了时间成本和人工成本;另外,该封堵装置制作成本低廉,施工方便,可循环使用,具有很强的实用性。
Building structure hole plugging device and method
The invention relates to the technical field of building construction, in particular to a building structure hole plugging device and method. The building structure hole plugging device comprises an umbrella-shaped plugging device assembly, a reference part, a positioning rod and a limiting part, the umbrella-shaped plugging device assembly is inverted and then stretches into a hole from an upper end opening of the hole, and an umbrella stand is located below a building structure; then the reference part and the positioning rod sequentially sleeve the umbrella handle, and the positioning rod is erected at the top of the hole; then, upward force is applied to the umbrella handle, when the umbrella stand is completely unfolded, the umbrella handle is fixed to the positioning rod through the limiting part, and at the moment, the reference part is located at the lower end opening of the hole; the hole is filled with a plugging material; and the building structure hole can be plugged. The building structure hole plugging operation is simple and convenient, and the time cost and the labor cost are reduced; and in addition, the building structure hole plugging device is low in manufacturing cost, convenient to construct, capable of being recycled and high in practicability.
本发明涉及建筑施工技术领域,尤其涉及一种建筑结构孔洞封堵装置及封堵方法,包括伞状封堵装置组件、基准件、定位杆和限位件,通过将伞状封堵装置组件倒置后从孔洞的上端口伸入孔洞,使得伞架位于建筑结构的下方;之后依次于伞柄上套设基准件和定位杆,且将定位杆架设于孔洞的顶部;然后对伞柄施加向上的力,并在伞架完全撑开时,利用限位件将伞柄固定在定位杆上,此时基准件位于孔洞的下端口;之后向所述孔洞填充封堵材料;从而能完成建筑结构孔洞的封堵,且该建筑结构孔洞封堵操作简便,降低了时间成本和人工成本;另外,该封堵装置制作成本低廉,施工方便,可循环使用,具有很强的实用性。
Building structure hole plugging device and method
一种建筑结构孔洞封堵装置及封堵方法
LIU TAO (author) / YAN YAN (author) / DAN WEI (author) / YUAN ZHENGQING (author)
2021-06-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building structure hole plugging device and construction method
European Patent Office | 2020
|Building side wall structure hole plugging assembly and plugging method
European Patent Office | 2022
|Hole plugging device and building floor stand pipe hole plugging construction method
European Patent Office | 2021
|Fabricated building outer wall hole plugging device and plugging method
European Patent Office | 2024
|