A platform for research: civil engineering, architecture and urbanism
The invention relates to a preparation method of high-strength green concrete. The high-strength green concrete is prepared through cooperation of an arranged mounting plate, an arranged fixing plate, an arranged crushing barrel, an arranged U-shaped frame, an arranged rough crushing device, an arranged fine crushing device, an arranged grinding device and an arranged discharging device. The high-strength green concrete preparation method provided by the invention can solve the problems that the manual crushing efficiency is low because the strength of steel slag is relatively high when the steel slag is manually crushed, the steel slag is generally and directly hit and crushed by a hammer and the like, the flying steel slag is easy to damage the staff, and when existing high-strength green concrete manufacturing equipment is used for manufacturing high-strength green concrete, an existing crushing device is difficult to fully crush the steel slag, so that the crushed steel slag is not uniformly crushed, and the strength of the manufactured concrete is affected by the steel slag are solved.
本发明涉及一种高强度绿色混凝土制备方法,通过设有的安装板、固定板、破碎筒、U形架、粗破装置、细破装置、研磨装置和下料装置协同完成高强度绿色混凝土的制备。本发明提供的一种高强度绿色混凝土制备方法,可以解决人工破碎钢渣时,由于钢渣强度较大,使得人工破碎效率低,且人工通常只使用锤子等直接对钢渣进行击打破碎,飞溅的钢渣易损伤工作人员以及现有高强度绿色混凝土制作设备在制作高强度绿色混凝土时,现有破碎装置难以对钢渣进行充分破碎,使得破碎后的钢渣破碎不均匀,从而使得钢渣影响制作出的混凝土的强度等问题。
The invention relates to a preparation method of high-strength green concrete. The high-strength green concrete is prepared through cooperation of an arranged mounting plate, an arranged fixing plate, an arranged crushing barrel, an arranged U-shaped frame, an arranged rough crushing device, an arranged fine crushing device, an arranged grinding device and an arranged discharging device. The high-strength green concrete preparation method provided by the invention can solve the problems that the manual crushing efficiency is low because the strength of steel slag is relatively high when the steel slag is manually crushed, the steel slag is generally and directly hit and crushed by a hammer and the like, the flying steel slag is easy to damage the staff, and when existing high-strength green concrete manufacturing equipment is used for manufacturing high-strength green concrete, an existing crushing device is difficult to fully crush the steel slag, so that the crushed steel slag is not uniformly crushed, and the strength of the manufactured concrete is affected by the steel slag are solved.
本发明涉及一种高强度绿色混凝土制备方法,通过设有的安装板、固定板、破碎筒、U形架、粗破装置、细破装置、研磨装置和下料装置协同完成高强度绿色混凝土的制备。本发明提供的一种高强度绿色混凝土制备方法,可以解决人工破碎钢渣时,由于钢渣强度较大,使得人工破碎效率低,且人工通常只使用锤子等直接对钢渣进行击打破碎,飞溅的钢渣易损伤工作人员以及现有高强度绿色混凝土制作设备在制作高强度绿色混凝土时,现有破碎装置难以对钢渣进行充分破碎,使得破碎后的钢渣破碎不均匀,从而使得钢渣影响制作出的混凝土的强度等问题。
Preparation method of high-strength green concrete
一种高强度绿色混凝土制备方法
LI WENHAI (author)
2021-07-02
Patent
Electronic Resource
Chinese
Preparation method of high-strength green recycled concrete
European Patent Office | 2020
High-strength heat-resistant green concrete and preparation method thereof
European Patent Office | 2025
|Green high-strength and high-toughness concrete and preparation process thereof
European Patent Office | 2022
|