Covering method for transverse road intersection
The invention discloses a covering method for a transverse road intersection. The method comprises the steps of S1 measuring the elevation of a crossed old road plane, and setting the laying of a covering layer according to different conditions of difference values between the design elevation and the original pavement elevation; and S2 before an asphalt mixture is additionally laid on an original pavement or a milled pavement, when an underlying layer is made of the asphalt mixture, spraying emulsified asphalt tack coat oil firstly; and when the underlying layer is a base layer, spraying emulsified asphalt prime coat oil firstly after the underlying layer is cleaned up. The method is wide in application range and high in practicability; new and old pavements are in smooth lap joint transition, so that the driving comfort is effectively guaranteed; lap joint positions are arranged in a staggered manner, the joint stress is uniformly dispersed, and the durability is greatly improved; and the traditional large-area milling or crushing reconstruction process is effectively solved, the investment of personnel, machinery and materials is reduced, and the economical efficiency is greatly improved.
本申请公开了一种横向道路交叉口的加罩方法,包括步骤S1,对交叉的老路平面标高进行测量,加罩层的铺设根据设计标高与原路面标高差值的不同情况设置;S2,在原路面或经铣刨后的路面上加铺沥青混合料前,对于下卧层为沥青混合料时,须先洒布乳化沥青粘层油;对于下卧层为基层时,应清扫干净后,先洒布乳化沥青透层油。本方法适用广泛,实用性强;新老路面搭接平顺过渡,有效保障行车舒适性;搭接位置错开布置,接缝受力均匀分散,大大提高耐久性;有效解决传统大面积铣刨或破碎重建工艺,减少人员、机械、材料投入,极大提高经济性。
Covering method for transverse road intersection
The invention discloses a covering method for a transverse road intersection. The method comprises the steps of S1 measuring the elevation of a crossed old road plane, and setting the laying of a covering layer according to different conditions of difference values between the design elevation and the original pavement elevation; and S2 before an asphalt mixture is additionally laid on an original pavement or a milled pavement, when an underlying layer is made of the asphalt mixture, spraying emulsified asphalt tack coat oil firstly; and when the underlying layer is a base layer, spraying emulsified asphalt prime coat oil firstly after the underlying layer is cleaned up. The method is wide in application range and high in practicability; new and old pavements are in smooth lap joint transition, so that the driving comfort is effectively guaranteed; lap joint positions are arranged in a staggered manner, the joint stress is uniformly dispersed, and the durability is greatly improved; and the traditional large-area milling or crushing reconstruction process is effectively solved, the investment of personnel, machinery and materials is reduced, and the economical efficiency is greatly improved.
本申请公开了一种横向道路交叉口的加罩方法,包括步骤S1,对交叉的老路平面标高进行测量,加罩层的铺设根据设计标高与原路面标高差值的不同情况设置;S2,在原路面或经铣刨后的路面上加铺沥青混合料前,对于下卧层为沥青混合料时,须先洒布乳化沥青粘层油;对于下卧层为基层时,应清扫干净后,先洒布乳化沥青透层油。本方法适用广泛,实用性强;新老路面搭接平顺过渡,有效保障行车舒适性;搭接位置错开布置,接缝受力均匀分散,大大提高耐久性;有效解决传统大面积铣刨或破碎重建工艺,减少人员、机械、材料投入,极大提高经济性。
Covering method for transverse road intersection
一种横向道路交叉口的加罩方法
WU SHUGUANG (author) / ZHAO FUQIANG (author) / GAO TENGFEI (author) / XI ZHENDONG (author) / SHANG HUIXIANG (author) / YUAN GUANGHAO (author)
2021-07-02
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
ROAD SURFACE COVERING SHEET AND ROAD SURFACE COVERING SHEET INSPECTION METHOD
European Patent Office | 2021
|Road film covering equipment for road maintenance and use method of road film covering equipment
European Patent Office | 2024
|