Dado integrated pipe culvert and construction method thereof
The invention discloses a dado integrated pipe culvert and a construction method thereof. The dado integrated pipe culvert comprises a plurality of pipe culvert units, each pipe culvert unit comprises a pipe joint and a dado arranged below the pipe joint, and the pipe joint and the dado are integrally poured. The construction method comprises the steps that S1 the steel reinforcement frameworks of the pipe joints and the steel reinforcement frameworks of the dadoes are bundled; S2 formworks are additionally installed on the steel reinforcement frameworks of the pipe joints and the steel reinforcement frameworks of the dadoes, concrete pouring is conducted, and the pipe culvert units are manufactured; and S3 the pipe culvert units are transported to the site to be installed. According to the invention, the steps of on-site mold filling and concrete pouring for manufacturing the dadoes are omitted, the installation construction efficiency of a road drainage pipeline can be improved, foundation pit excavation and pipe culvert unit prefabrication can be conducted at the same time, the construction period can be greatly shortened, and the installation construction efficiency of the road drainage pipeline can be improved.
本发明公开了一种护壁一体化管涵及其施工方法,护壁一体化管涵包括多个管涵单元,所述管涵单元包括管节和设置在所述管节下方的护壁,所述管节和所述护壁一体浇筑。施工方法包括:S1、捆扎所述管节的钢筋骨架和所述护壁的钢筋骨架;S2、对所述管节的钢筋骨架和所述护壁的钢筋骨架加装模板并进行混凝土浇灌,制成所述管涵单元;S3、将所述管涵单元运输至现场进行安装。本发明减少了现场装模、浇筑混凝土以用于制作护壁的步骤,能够提高道路排水管道的安装施工效率,并且挖掘基坑和管涵单元的预制可以同时进行,可以极大地缩减施工工期,提高道路排水管道的安装施工效率。
Dado integrated pipe culvert and construction method thereof
The invention discloses a dado integrated pipe culvert and a construction method thereof. The dado integrated pipe culvert comprises a plurality of pipe culvert units, each pipe culvert unit comprises a pipe joint and a dado arranged below the pipe joint, and the pipe joint and the dado are integrally poured. The construction method comprises the steps that S1 the steel reinforcement frameworks of the pipe joints and the steel reinforcement frameworks of the dadoes are bundled; S2 formworks are additionally installed on the steel reinforcement frameworks of the pipe joints and the steel reinforcement frameworks of the dadoes, concrete pouring is conducted, and the pipe culvert units are manufactured; and S3 the pipe culvert units are transported to the site to be installed. According to the invention, the steps of on-site mold filling and concrete pouring for manufacturing the dadoes are omitted, the installation construction efficiency of a road drainage pipeline can be improved, foundation pit excavation and pipe culvert unit prefabrication can be conducted at the same time, the construction period can be greatly shortened, and the installation construction efficiency of the road drainage pipeline can be improved.
本发明公开了一种护壁一体化管涵及其施工方法,护壁一体化管涵包括多个管涵单元,所述管涵单元包括管节和设置在所述管节下方的护壁,所述管节和所述护壁一体浇筑。施工方法包括:S1、捆扎所述管节的钢筋骨架和所述护壁的钢筋骨架;S2、对所述管节的钢筋骨架和所述护壁的钢筋骨架加装模板并进行混凝土浇灌,制成所述管涵单元;S3、将所述管涵单元运输至现场进行安装。本发明减少了现场装模、浇筑混凝土以用于制作护壁的步骤,能够提高道路排水管道的安装施工效率,并且挖掘基坑和管涵单元的预制可以同时进行,可以极大地缩减施工工期,提高道路排水管道的安装施工效率。
Dado integrated pipe culvert and construction method thereof
一种护壁一体化管涵及其施工方法
TAN JIAN (author) / ZHOU LEI (author) / HUANG MIN (author) / SHI ZHEN (author) / LI LI (author) / CAO LE (author) / KANG QINZU (author) / YANG JIADONG (author)
2021-07-02
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Perforated drain pipe culvert and construction method thereof
European Patent Office | 2018
|