Large-span vestibule truss integral transportation method
The invention discloses a large-span vestibule truss integral transportation method. The large-span vestibule truss integral transportation method comprises the following steps that S1, an assembling site is selected, specifically, the site suitable for assembling is selected; S2, assembling is conducted, specifically, a vestibule truss is assembled; S3, hoisting is conducted, specifically, the vestibule truss assembled in the step S2 is hoisted away from the ground through a crawler crane, two platform plate trailers slowly back to the position below the vestibule truss in the front-back direction, a portal of the vestibule truss is located in the center of rear wheels of the platform plate trailers, and the vestibule truss is slowly lowered onto the platform plate trailers; S4, transportation is conducted, specifically, the two platform plate trailers are started simultaneously, one platform plate trailer moves forwards, the other platform plate trailer moves backwards, and the vestibule truss is transported to the hoisting position; and S5, unloading is conducted, specifically, the vestibule truss is unloaded through the crawler crane, the platform plate trailers are driven away after the vestibule truss is hoisted away from the platform plate trailers, and then the vestibule truss is put down. The large-span vestibule truss integral transportation method is efficient and low in cost.
本发明公开一种大跨度通廊桁架整体运输方法,包括以下步骤:S1、拼装场地选择,选择适合拼装的场地;S2、拼装,拼装通廊桁架;S3、吊装,用履带吊将步骤S2拼装好的通廊桁架吊离地面,2台板车前后缓慢倒车到通廊桁架下面,使通廊桁架得门架位于板车后车轮中心,将通廊桁架缓慢下降到板车上;S4、运输,两台板车同时启动,一台前行、一台后退,将通廊桁架运输到吊装位置;S5、卸载,用履带吊卸载通廊桁架,将通廊桁架吊离板车后将板车驶离,再将通廊桁架放下;本发明提供了一种高效、低成本的大跨度通廊桁架整体运输方法。
Large-span vestibule truss integral transportation method
The invention discloses a large-span vestibule truss integral transportation method. The large-span vestibule truss integral transportation method comprises the following steps that S1, an assembling site is selected, specifically, the site suitable for assembling is selected; S2, assembling is conducted, specifically, a vestibule truss is assembled; S3, hoisting is conducted, specifically, the vestibule truss assembled in the step S2 is hoisted away from the ground through a crawler crane, two platform plate trailers slowly back to the position below the vestibule truss in the front-back direction, a portal of the vestibule truss is located in the center of rear wheels of the platform plate trailers, and the vestibule truss is slowly lowered onto the platform plate trailers; S4, transportation is conducted, specifically, the two platform plate trailers are started simultaneously, one platform plate trailer moves forwards, the other platform plate trailer moves backwards, and the vestibule truss is transported to the hoisting position; and S5, unloading is conducted, specifically, the vestibule truss is unloaded through the crawler crane, the platform plate trailers are driven away after the vestibule truss is hoisted away from the platform plate trailers, and then the vestibule truss is put down. The large-span vestibule truss integral transportation method is efficient and low in cost.
本发明公开一种大跨度通廊桁架整体运输方法,包括以下步骤:S1、拼装场地选择,选择适合拼装的场地;S2、拼装,拼装通廊桁架;S3、吊装,用履带吊将步骤S2拼装好的通廊桁架吊离地面,2台板车前后缓慢倒车到通廊桁架下面,使通廊桁架得门架位于板车后车轮中心,将通廊桁架缓慢下降到板车上;S4、运输,两台板车同时启动,一台前行、一台后退,将通廊桁架运输到吊装位置;S5、卸载,用履带吊卸载通廊桁架,将通廊桁架吊离板车后将板车驶离,再将通廊桁架放下;本发明提供了一种高效、低成本的大跨度通廊桁架整体运输方法。
Large-span vestibule truss integral transportation method
一种大跨度通廊桁架整体运输方法
LIN FUBIN (author) / HE JUNHUA (author) / YANG LIFA (author) / MENG QINGHUAN (author) / QIU XUEFENG (author)
2021-07-02
Patent
Electronic Resource
Chinese
Method for hoisting and unloading large-span vestibule truss
European Patent Office | 2024
|Overhead cable vestibule with steel pipe truss structure
European Patent Office | 2021
|Large-span cantilever truss integral lifting hydraulic press platform
European Patent Office | 2021
|