A platform for research: civil engineering, architecture and urbanism
Floor thickness accurate control construction process and controller
The invention relates to the technical field of building construction, and discloses a floor thickness accurate control construction process and a controller. The controller comprises a bearing base, wherein the upper surface of the bearing base is fixedly connected with a supporting plate; the upper end of the supporting plate is fixedly connected with a water stop ring; the upper surface of the bearing base is fixedly connected with a lower rib placing block; the upper surface of the water stop ring is fixedly connected with an adjusting plate; the upper surface of the adjusting plate is fixedly connected with a floor placing platform; the right side surface of the adjusting plate is fixedly connected with an upper rib placing block; a first mounting groove is formed in the water stop ring; a second mounting groove is formed in the supporting plate; and an adjusting structure is arranged in the second mounting groove. According to the floor thickness accurate control construction process and the controller, the controller can carry out corresponding height adjustment according to construction floors with different thicknesses, so that the efficiency of floor construction is improved, the speed of floor construction is guaranteed, and the practicability and the use value of the controller are improved.
本发明涉及建筑施工技术领域,且公开了一种楼板厚度精准控制施工工艺及控制器,包括承重底座,承重底座的上表面固定连接有支撑板,支撑板的上端固定连接有止水环,承重底座的上表面固定连接有下筋放置块,止水环的上表面固定连接有调节板,调节板的上表面固定连接有楼板放置平台,调节板的右侧表面固定连接有上筋放置块,止水环上开设有第一安装槽,支撑板的内部开设有第二安装槽,第二安装槽内设置有调节结构。该楼板厚度精准控制施工工艺及控制器,控制器可以根据不同厚度的施工楼板进行相对应的高度调节,从而提高了对楼板施工时的效率,保障了楼层建设的速度,提高了该控制器的实用性以及使用价值。
Floor thickness accurate control construction process and controller
The invention relates to the technical field of building construction, and discloses a floor thickness accurate control construction process and a controller. The controller comprises a bearing base, wherein the upper surface of the bearing base is fixedly connected with a supporting plate; the upper end of the supporting plate is fixedly connected with a water stop ring; the upper surface of the bearing base is fixedly connected with a lower rib placing block; the upper surface of the water stop ring is fixedly connected with an adjusting plate; the upper surface of the adjusting plate is fixedly connected with a floor placing platform; the right side surface of the adjusting plate is fixedly connected with an upper rib placing block; a first mounting groove is formed in the water stop ring; a second mounting groove is formed in the supporting plate; and an adjusting structure is arranged in the second mounting groove. According to the floor thickness accurate control construction process and the controller, the controller can carry out corresponding height adjustment according to construction floors with different thicknesses, so that the efficiency of floor construction is improved, the speed of floor construction is guaranteed, and the practicability and the use value of the controller are improved.
本发明涉及建筑施工技术领域,且公开了一种楼板厚度精准控制施工工艺及控制器,包括承重底座,承重底座的上表面固定连接有支撑板,支撑板的上端固定连接有止水环,承重底座的上表面固定连接有下筋放置块,止水环的上表面固定连接有调节板,调节板的上表面固定连接有楼板放置平台,调节板的右侧表面固定连接有上筋放置块,止水环上开设有第一安装槽,支撑板的内部开设有第二安装槽,第二安装槽内设置有调节结构。该楼板厚度精准控制施工工艺及控制器,控制器可以根据不同厚度的施工楼板进行相对应的高度调节,从而提高了对楼板施工时的效率,保障了楼层建设的速度,提高了该控制器的实用性以及使用价值。
Floor thickness accurate control construction process and controller
一种楼板厚度精准控制施工工艺及控制器
MA XIAOJUN (author) / DENG PEICHU (author) / HU YUEJUN (author) / LIANG MINGJIAN (author)
2021-07-02
Patent
Electronic Resource
Chinese
Concrete floor thickness controller and construction method
European Patent Office | 2021
|Reinforced concrete floor slab protective layer thickness control device and construction process
European Patent Office | 2021
|Cast-in-place floor slab thickness embedded control construction method
European Patent Office | 2020
|