A platform for research: civil engineering, architecture and urbanism
Pile foundation construction system suitable for karst area
The invention belongs to the technical field of pile foundation construction, and discloses a pile foundation construction system suitable for a karst area. The system comprising a geographic information acquisition module, a drilling position selection module, a drilling module, a slurry preparation module, a central control module, a drilling fixing module, a karst cave detection module, a construction information acquisition module, a construction route planning module and a storage and display module. According to the pile foundation construction system suitable for the karst area, when the pile foundation is constructed in the karst foundation, a hole is dug firstly to form a pile hole, marking is conducted when horizontal karst near the pile end is extremely developed, avoiding is conducted during construction, then operation of pile foundation construction is simplified, and the karst cave area is avoided; the surface of a cylindrical channel formed by drilling is coated with slurry, the surface of the drilling channel is smoother, soil falling is reduced, and pile foundation construction is more convenient. The system is simple in structure, accurate detection of the karst cave can be achieved, and convenience of pile foundation construction is improved.
本发明属于桩基施工技术领域,公开了一种适用于岩溶区的桩基施工系统,包括:地理信息获取模块、钻孔位置选择模块、钻孔模块、泥浆制备模块、中央控制模块、钻孔固定模块、溶洞探测模块、施工信息获取模块、施工路线规划模块、存储与显示模块。本发明提供的适用于岩溶区的桩基施工系统在岩溶地基中施工桩基时,先挖孔形成桩孔,遇到桩端附近水平岩溶极为发育的情况时进行标注,在施工时进行避开,进而实现桩基施工的操作的简化,避开溶洞区域;进行钻孔形成的圆柱形通道的表面的泥浆涂覆,钻孔通道表面更加光滑,减少土壤的脱落,进行桩基施工更加方便。本发明提供的系统结构简单,能够实现溶洞的准确探测,实现桩基施工的方便性的提升。
Pile foundation construction system suitable for karst area
The invention belongs to the technical field of pile foundation construction, and discloses a pile foundation construction system suitable for a karst area. The system comprising a geographic information acquisition module, a drilling position selection module, a drilling module, a slurry preparation module, a central control module, a drilling fixing module, a karst cave detection module, a construction information acquisition module, a construction route planning module and a storage and display module. According to the pile foundation construction system suitable for the karst area, when the pile foundation is constructed in the karst foundation, a hole is dug firstly to form a pile hole, marking is conducted when horizontal karst near the pile end is extremely developed, avoiding is conducted during construction, then operation of pile foundation construction is simplified, and the karst cave area is avoided; the surface of a cylindrical channel formed by drilling is coated with slurry, the surface of the drilling channel is smoother, soil falling is reduced, and pile foundation construction is more convenient. The system is simple in structure, accurate detection of the karst cave can be achieved, and convenience of pile foundation construction is improved.
本发明属于桩基施工技术领域,公开了一种适用于岩溶区的桩基施工系统,包括:地理信息获取模块、钻孔位置选择模块、钻孔模块、泥浆制备模块、中央控制模块、钻孔固定模块、溶洞探测模块、施工信息获取模块、施工路线规划模块、存储与显示模块。本发明提供的适用于岩溶区的桩基施工系统在岩溶地基中施工桩基时,先挖孔形成桩孔,遇到桩端附近水平岩溶极为发育的情况时进行标注,在施工时进行避开,进而实现桩基施工的操作的简化,避开溶洞区域;进行钻孔形成的圆柱形通道的表面的泥浆涂覆,钻孔通道表面更加光滑,减少土壤的脱落,进行桩基施工更加方便。本发明提供的系统结构简单,能够实现溶洞的准确探测,实现桩基施工的方便性的提升。
Pile foundation construction system suitable for karst area
一种适用于岩溶区的桩基施工系统
CHEN JUNSHENG (author) / WU BINGXIN (author) / LIU SHUZHUO (author) / ZHOU HUANYANG (author) / MA CHAO (author)
2021-07-02
Patent
Electronic Resource
Chinese
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E02D
FOUNDATIONS
,
Gründungen
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
Karst area pile foundation construction method and karst area pile foundation construction device
European Patent Office | 2022
|Karst area pile foundation construction system and construction method
European Patent Office | 2020
|Pile foundation underpinning construction technology suitable for karst geology
European Patent Office | 2024
|