Pavement slab rapid breaking construction method and a pavement slab rapid rebuilding method
The invention relates to a pavement slab rapid breaking construction method and a pavement slab rapid rebuilding method, and belongs to the technical field of airfield pavement maintenance. The pavement slab rapid breaking construction method comprises the steps that a slab seam line between a to-be-broken breaking slab and an intact slab is marked on a pavement slab, and a cutting line is marked at the position, close to the slab seam line, of the breaking slab; manual chiseling is conducted on the position, between the cutting line and the slab seam line, of the breaking slab, and a protection area is formed; the center position of the breaking slab is broken, and a center breaking area and a free edge of the breaking slab are formed; crushing is carried out from the central breaking area to the slab seam line by using a crusher from inside to outside; and then pouring of the repairing slab is carried out. According to the application, a mode of manually chiseling out the protection area is adopted, so that the adjacent intact slabs can be effectively prevented from being extruded and damaged when the crushing machine is used for crushing the breaking slab.
本申请涉及一种道面板快速破除施工方法及道面板的快速翻修方法,属于机场道面维修的技术领域,其包括在道面板上标出待破碎的破除板块与完好板块之间的板缝线,在破除板块上靠近板缝线的位置标出切割线;在破除板块上位于切割线与板缝线之间的位置人工剔凿,形成保护区;对破除板块的中心位置进行破碎,形成中心破碎区以及破除板块的自由边;利用破碎机按照由内向外的顺序从中心破碎区向板缝线进行破碎;之后进行修复板块的浇筑。本申请采用人工剔凿出保护区的方式,能够有效防止在利用破碎机对破除板块进行破碎时相邻的完好板块被挤压而破坏。
Pavement slab rapid breaking construction method and a pavement slab rapid rebuilding method
The invention relates to a pavement slab rapid breaking construction method and a pavement slab rapid rebuilding method, and belongs to the technical field of airfield pavement maintenance. The pavement slab rapid breaking construction method comprises the steps that a slab seam line between a to-be-broken breaking slab and an intact slab is marked on a pavement slab, and a cutting line is marked at the position, close to the slab seam line, of the breaking slab; manual chiseling is conducted on the position, between the cutting line and the slab seam line, of the breaking slab, and a protection area is formed; the center position of the breaking slab is broken, and a center breaking area and a free edge of the breaking slab are formed; crushing is carried out from the central breaking area to the slab seam line by using a crusher from inside to outside; and then pouring of the repairing slab is carried out. According to the application, a mode of manually chiseling out the protection area is adopted, so that the adjacent intact slabs can be effectively prevented from being extruded and damaged when the crushing machine is used for crushing the breaking slab.
本申请涉及一种道面板快速破除施工方法及道面板的快速翻修方法,属于机场道面维修的技术领域,其包括在道面板上标出待破碎的破除板块与完好板块之间的板缝线,在破除板块上靠近板缝线的位置标出切割线;在破除板块上位于切割线与板缝线之间的位置人工剔凿,形成保护区;对破除板块的中心位置进行破碎,形成中心破碎区以及破除板块的自由边;利用破碎机按照由内向外的顺序从中心破碎区向板缝线进行破碎;之后进行修复板块的浇筑。本申请采用人工剔凿出保护区的方式,能够有效防止在利用破碎机对破除板块进行破碎时相邻的完好板块被挤压而破坏。
Pavement slab rapid breaking construction method and a pavement slab rapid rebuilding method
一种道面板快速破除施工方法及道面板的快速翻修方法
JIN MIN (author) / LIU AIJUN (author) / LEI CHANGLONG (author) / LIU TINGRONG (author) / WANG YAN (author) / WANG JIANGUO (author) / JIANG ZHENG (author)
2021-07-06
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
European Patent Office | 2022
|