A platform for research: civil engineering, architecture and urbanism
Pile centralizing device for bridge construction
The invention relates to a pile centralizing device for bridge construction. The device comprises a support, a driving mechanism, a clamping mechanism and a buffering mechanism, the driving mechanism is arranged on a supporting rod, the clamping mechanism is arranged on one side of the supporting rod, the buffering mechanism is arranged on the clamping mechanism, the support comprises a base and the supporting rod, and the driving mechanism comprises a driving assembly and a pulling assembly. The clamping mechanism comprises a connecting assembly, a positioning assembly, a pressing assembly and a tightening assembly, the buffering mechanism comprises a bottom plate and a buffering assembly, according to the pile centralizing device for bridge construction, the clamping of a pile is achieved through the clamping mechanism, damping buffering is conducted on downward sliding of the pile through the buffering mechanism, the downward sliding of the pile is made to be stable, and the safety is improved. According to the clamping mechanism, through multiple clamping, the good clamping effect is achieved, meanwhile, clamping blocks achieve a certain damping effect on the sliding down of the pile, multiple damping is conducted on sliding down of the pile, the better damping buffering effect is achieved, and the practicability is improved.
本发明涉及一种用于桥梁施工的桩柱扶正装置,包括支架、驱动机构、夹持机构和缓冲机构,驱动机构设置在支杆上,夹持机构设置在支杆的一侧,缓冲机构设置在夹持机构上,支架包括底座和支杆,驱动机构包括驱动组件和拉动组件,夹持机构包括连接组件、定位组件、下压组件和收紧组件,缓冲机构包括底板和缓冲组件,该用于桥梁施工的桩柱扶正装置,通过夹持机构实现桩柱的夹紧,通过缓冲机构对桩柱的下滑进行阻尼缓冲,使得桩柱下滑的较为稳定,提高了安全性,该夹持机构通过多重夹持,实现较好的夹持效果,同时夹块也对桩柱的下滑实现了一定的阻尼效果,从而对桩柱的下滑进行多重阻尼,从而实现更好的阻尼缓冲效果,提高了实用性。
Pile centralizing device for bridge construction
The invention relates to a pile centralizing device for bridge construction. The device comprises a support, a driving mechanism, a clamping mechanism and a buffering mechanism, the driving mechanism is arranged on a supporting rod, the clamping mechanism is arranged on one side of the supporting rod, the buffering mechanism is arranged on the clamping mechanism, the support comprises a base and the supporting rod, and the driving mechanism comprises a driving assembly and a pulling assembly. The clamping mechanism comprises a connecting assembly, a positioning assembly, a pressing assembly and a tightening assembly, the buffering mechanism comprises a bottom plate and a buffering assembly, according to the pile centralizing device for bridge construction, the clamping of a pile is achieved through the clamping mechanism, damping buffering is conducted on downward sliding of the pile through the buffering mechanism, the downward sliding of the pile is made to be stable, and the safety is improved. According to the clamping mechanism, through multiple clamping, the good clamping effect is achieved, meanwhile, clamping blocks achieve a certain damping effect on the sliding down of the pile, multiple damping is conducted on sliding down of the pile, the better damping buffering effect is achieved, and the practicability is improved.
本发明涉及一种用于桥梁施工的桩柱扶正装置,包括支架、驱动机构、夹持机构和缓冲机构,驱动机构设置在支杆上,夹持机构设置在支杆的一侧,缓冲机构设置在夹持机构上,支架包括底座和支杆,驱动机构包括驱动组件和拉动组件,夹持机构包括连接组件、定位组件、下压组件和收紧组件,缓冲机构包括底板和缓冲组件,该用于桥梁施工的桩柱扶正装置,通过夹持机构实现桩柱的夹紧,通过缓冲机构对桩柱的下滑进行阻尼缓冲,使得桩柱下滑的较为稳定,提高了安全性,该夹持机构通过多重夹持,实现较好的夹持效果,同时夹块也对桩柱的下滑实现了一定的阻尼效果,从而对桩柱的下滑进行多重阻尼,从而实现更好的阻尼缓冲效果,提高了实用性。
Pile centralizing device for bridge construction
一种用于桥梁施工的桩柱扶正装置
ZHANG SHUNKANG (author)
2021-07-06
Patent
Electronic Resource
Chinese
British Library Conference Proceedings | 1994
|RECYCLABLE REBAR CAGE CENTRALIZING SYSTEM AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2021
|