A platform for research: civil engineering, architecture and urbanism
Melon-rind-shaped special-shaped hyperbolic metal roof construction method
The invention discloses a melon-rind-shaped special-shaped hyperbolic metal roof construction method, and belongs to the technical field of building construction. The method comprises the steps of 1, conducting preparation work, specifically, preparinga construction blueprint and a BIM workstation, and building a BIM modeler; 2, establishing a three-dimensional information model, and determining the sizes, positions and final layout of metal roof keels, embedded parts and the melon-rind-shaped special-shaped hyperbolic metal roof; 3, providing a planar graph, an elevation graph, a profile graph and a three-dimensional graph based on the BIM; 4, processing and manufacturing a metal roof keel and a metal plate; and 5, installing and constructing based on the BIM. The advantages of BIM are fully utilized, the communication effect is effectively improved through three-dimensional information data, the utilization rate of the metal plates is increased, waste is avoided, the installation precision is high, and practicability is high.
本发明公开了一种瓜皮状异形双曲金属屋面施工方法,属于建筑施工技术领域。本发明的步骤为:一、准备工作,准备好施工蓝图、BIM工作站,组建好BIM建模师;二、建立三维信息模型,确定金属屋面龙骨、埋件及瓜皮状异形双曲金属屋面的尺寸、位置及最终布局;三、基于BIM出具平面图、立面图、剖面图及三维图;四、金属屋面龙骨、金属板材加工制作;五、基于BIM安装施工。本发明充分利用BIM所具有的优势,三维信息数据有效提高沟通效果,提高金属板材的使用率,避免浪费,安装精度高,实用性强。
Melon-rind-shaped special-shaped hyperbolic metal roof construction method
The invention discloses a melon-rind-shaped special-shaped hyperbolic metal roof construction method, and belongs to the technical field of building construction. The method comprises the steps of 1, conducting preparation work, specifically, preparinga construction blueprint and a BIM workstation, and building a BIM modeler; 2, establishing a three-dimensional information model, and determining the sizes, positions and final layout of metal roof keels, embedded parts and the melon-rind-shaped special-shaped hyperbolic metal roof; 3, providing a planar graph, an elevation graph, a profile graph and a three-dimensional graph based on the BIM; 4, processing and manufacturing a metal roof keel and a metal plate; and 5, installing and constructing based on the BIM. The advantages of BIM are fully utilized, the communication effect is effectively improved through three-dimensional information data, the utilization rate of the metal plates is increased, waste is avoided, the installation precision is high, and practicability is high.
本发明公开了一种瓜皮状异形双曲金属屋面施工方法,属于建筑施工技术领域。本发明的步骤为:一、准备工作,准备好施工蓝图、BIM工作站,组建好BIM建模师;二、建立三维信息模型,确定金属屋面龙骨、埋件及瓜皮状异形双曲金属屋面的尺寸、位置及最终布局;三、基于BIM出具平面图、立面图、剖面图及三维图;四、金属屋面龙骨、金属板材加工制作;五、基于BIM安装施工。本发明充分利用BIM所具有的优势,三维信息数据有效提高沟通效果,提高金属板材的使用率,避免浪费,安装精度高,实用性强。
Melon-rind-shaped special-shaped hyperbolic metal roof construction method
一种瓜皮状异形双曲金属屋面施工方法
WANG SHENJIE (author)
2021-07-09
Patent
Electronic Resource
Chinese
Modeling design construction method for hyperbolic special-shaped roof
European Patent Office | 2024
|Special-shaped adjustable metal roof system and construction method
European Patent Office | 2023
|Construction method of hyperbolic special-shaped building
European Patent Office | 2024
|Curved special-shaped metal roof of stadium and construction method
European Patent Office | 2024
|