A platform for research: civil engineering, architecture and urbanism
Disc buckle frame jacking base
The invention discloses a disc buckle frame jacking base. The disc buckle frame jacking base comprises a jacking rod, a limiting piece and a reinforcing piece, the limiting piece is arranged on the side wall of the jacking rod, and the reinforcing piece is arranged at the bottom end of the jacking rod; and the bottom of the limiting piece is arranged on the tops of the two supporting steel channel. Through the mass of the reinforcing device in the jacking base, the gravity center of the jacking base is lowered, so that the phenomenon that the jacking base rolls off when not in a working state is avoided, and the stability of the jacking base is improved; moreover, the reinforcing device exerts downward acting force on the steel channel, the friction force between the jacking base and the steel channel is increased, and the jacking base can be effectively prevented from sliding; and furthermore, the reinforcing device can be formed by welding on-site reinforcing steel bar waste, the cost is low, and the manufacturing process is simple.
本发明公开了一种盘扣架顶托基座,所述顶托基座包括顶杆、限位件和加固件,所述限位件设置于所述顶杆的侧壁之上,所述加固件设置于所述顶杆的底端;所述限位件的底部设置于两支撑槽钢的顶部。本发明顶托基座中加固装置的质量设置,降低了顶托基座的重心,从而避免了其在未处于工作状态下时,发生滚落等现象,提升了顶托基座的稳定性。并且,加固装置对槽钢又施加了一个向下的作用力,提升了顶托基座与槽钢之间摩擦力,可以有效的防止顶托基座滑动。进一步地,加固装置可以用现场钢筋废料焊接而成,成本小、制作过程简单。
Disc buckle frame jacking base
The invention discloses a disc buckle frame jacking base. The disc buckle frame jacking base comprises a jacking rod, a limiting piece and a reinforcing piece, the limiting piece is arranged on the side wall of the jacking rod, and the reinforcing piece is arranged at the bottom end of the jacking rod; and the bottom of the limiting piece is arranged on the tops of the two supporting steel channel. Through the mass of the reinforcing device in the jacking base, the gravity center of the jacking base is lowered, so that the phenomenon that the jacking base rolls off when not in a working state is avoided, and the stability of the jacking base is improved; moreover, the reinforcing device exerts downward acting force on the steel channel, the friction force between the jacking base and the steel channel is increased, and the jacking base can be effectively prevented from sliding; and furthermore, the reinforcing device can be formed by welding on-site reinforcing steel bar waste, the cost is low, and the manufacturing process is simple.
本发明公开了一种盘扣架顶托基座,所述顶托基座包括顶杆、限位件和加固件,所述限位件设置于所述顶杆的侧壁之上,所述加固件设置于所述顶杆的底端;所述限位件的底部设置于两支撑槽钢的顶部。本发明顶托基座中加固装置的质量设置,降低了顶托基座的重心,从而避免了其在未处于工作状态下时,发生滚落等现象,提升了顶托基座的稳定性。并且,加固装置对槽钢又施加了一个向下的作用力,提升了顶托基座与槽钢之间摩擦力,可以有效的防止顶托基座滑动。进一步地,加固装置可以用现场钢筋废料焊接而成,成本小、制作过程简单。
Disc buckle frame jacking base
一种盘扣架顶托基座
WANG ZHONGQUAN (author) / ZHANG TAO (author) / GAO JIATAO (author) / ZHONG DEZHI (author)
2021-07-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Adjustable jacking under disc buckle quick-dismounting supporting system
European Patent Office | 2021
|Connection type disc buckle structure and disc buckle frame
European Patent Office | 2024
|Disc buckle support jacking and unloading device and method thereof
European Patent Office | 2023
|