A platform for research: civil engineering, architecture and urbanism
Follow-up pile casing suitable for sandy gravel stratum and construction method thereof
The invention relates to the technical field of rotary drilling machines, in particular to a follow-up pile casing suitable for a sandy gravel stratum and a construction method thereof. The follow-up pile casing comprises at least one section of follow-up pile casing body, a first butt joint and a second butt joint are arranged at the two ends of the at least one section of follow-up pile casing body respectively, the two sections of follow-up pile casing bodies can be connected through the arrangement of the first butt joint and the second butt joint, a clamping block is arranged on the second butt joint, a clamping groove matched with the clamping block is formed in the inner surface of the first butt joint, and a spiral wall is arranged on the outer surfaces of the follow-up pile casing bodies. The spiral wall is arranged on the outer surface of the follow-up pile casing, so that the follow-up pile casing is easier to go deep into the sandy gravel stratum, and meanwhile, the repeated follow-up pile casing is pulled out in time in the construction process, so that the engineering construction cost is saved.
本发明涉及旋挖机技术领域,具体为一种适用于砂卵石地层的跟进护筒及其施工方法;包括至少一节跟进护筒本体,所述跟进护筒本体两端分别为第一对接头和第二对接头,所述第一对接头和第二对接头的设置可使两节跟进护筒本体相接,所述第二对接头上设置有卡块,所述第一对接头内表面上设置有与卡块相匹配的卡槽,所述跟进护筒本体外表面上设置有螺旋壁;本发明在跟进护筒外表面设置螺旋壁,让跟进护筒更容易深入砂卵石地层内,同时在施工过程中及时拔出重复跟进护筒,因此节约了工程施工成本。
Follow-up pile casing suitable for sandy gravel stratum and construction method thereof
The invention relates to the technical field of rotary drilling machines, in particular to a follow-up pile casing suitable for a sandy gravel stratum and a construction method thereof. The follow-up pile casing comprises at least one section of follow-up pile casing body, a first butt joint and a second butt joint are arranged at the two ends of the at least one section of follow-up pile casing body respectively, the two sections of follow-up pile casing bodies can be connected through the arrangement of the first butt joint and the second butt joint, a clamping block is arranged on the second butt joint, a clamping groove matched with the clamping block is formed in the inner surface of the first butt joint, and a spiral wall is arranged on the outer surfaces of the follow-up pile casing bodies. The spiral wall is arranged on the outer surface of the follow-up pile casing, so that the follow-up pile casing is easier to go deep into the sandy gravel stratum, and meanwhile, the repeated follow-up pile casing is pulled out in time in the construction process, so that the engineering construction cost is saved.
本发明涉及旋挖机技术领域,具体为一种适用于砂卵石地层的跟进护筒及其施工方法;包括至少一节跟进护筒本体,所述跟进护筒本体两端分别为第一对接头和第二对接头,所述第一对接头和第二对接头的设置可使两节跟进护筒本体相接,所述第二对接头上设置有卡块,所述第一对接头内表面上设置有与卡块相匹配的卡槽,所述跟进护筒本体外表面上设置有螺旋壁;本发明在跟进护筒外表面设置螺旋壁,让跟进护筒更容易深入砂卵石地层内,同时在施工过程中及时拔出重复跟进护筒,因此节约了工程施工成本。
Follow-up pile casing suitable for sandy gravel stratum and construction method thereof
一种适用于砂卵石地层的跟进护筒及其施工方法
RAN JINGJUN (author) / MA LINGLING (author)
2021-07-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Dry sandy gravel stratum cast-in-place pile construction method
European Patent Office | 2022
|Retrusive localized grouting method and structure suitable for sandy gravel stratum
European Patent Office | 2024
|Construction method for waterproof curtain of sandy gravel stratum
European Patent Office | 2022
|Underlying inclined stratum gravel pile construction device
European Patent Office | 2024
|European Patent Office | 2024
|