A platform for research: civil engineering, architecture and urbanism
Steel sheet pile and water-permeable sand-based cofferdam foundation rapid anti-seepage construction method
The invention discloses a steel sheet pile which comprises a base plate; the left end and the right end of the base plate extend towards one side to be provided with a left connecting plate and a right connecting plate respectively; an included angle between the left connecting plate and the right connecting plate is an acute angle; and the tail end of the left connecting plate and the tail end of the right connecting plate are each provided with a connecting part movably connected with other steel sheet piles of a same structure. The steel sheet pile is simple and reasonable in structure and ingenious in design, a rapid seepage prevention method implemented through the steel sheet pile is easy to operate, the construction strength can be reduced, the construction efficiency can be improved, and seepage prevention can be rapidly and effectively conducted on sand gravel of a cofferdam foundation.
本发明公开了一种钢板桩,其包括基板,于该基板的左端、右端分别向一侧延伸设有左连接板、右连接板,该左连接板、右连接板之间的夹角为锐角,该左连接板、右连接板的末端均设有与其他相同结构钢板桩活动连接的连接部。本发明中钢板桩结构简单合理,设计巧妙,通过该钢板桩实施的快速防渗方法操作简易,能够降低施工强度,提高施工效率,能快速有效对围堰基础砂砾石进行防渗。
Steel sheet pile and water-permeable sand-based cofferdam foundation rapid anti-seepage construction method
The invention discloses a steel sheet pile which comprises a base plate; the left end and the right end of the base plate extend towards one side to be provided with a left connecting plate and a right connecting plate respectively; an included angle between the left connecting plate and the right connecting plate is an acute angle; and the tail end of the left connecting plate and the tail end of the right connecting plate are each provided with a connecting part movably connected with other steel sheet piles of a same structure. The steel sheet pile is simple and reasonable in structure and ingenious in design, a rapid seepage prevention method implemented through the steel sheet pile is easy to operate, the construction strength can be reduced, the construction efficiency can be improved, and seepage prevention can be rapidly and effectively conducted on sand gravel of a cofferdam foundation.
本发明公开了一种钢板桩,其包括基板,于该基板的左端、右端分别向一侧延伸设有左连接板、右连接板,该左连接板、右连接板之间的夹角为锐角,该左连接板、右连接板的末端均设有与其他相同结构钢板桩活动连接的连接部。本发明中钢板桩结构简单合理,设计巧妙,通过该钢板桩实施的快速防渗方法操作简易,能够降低施工强度,提高施工效率,能快速有效对围堰基础砂砾石进行防渗。
Steel sheet pile and water-permeable sand-based cofferdam foundation rapid anti-seepage construction method
一种钢板桩及透水性砂基围堰基础快速防渗工法
TANG XIANG (author) / JIANG SHIJI (author) / LU MIN'AN (author) / ZHANG XIAOQING (author) / MO XIAODI (author) / QIN HOULIANG (author) / HUANG YUECHAO (author) / CHEN RONGHUA (author) / LU HUANAN (author) / PENG GAOZHU (author)
2021-07-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Seepage into Sheet Pile Cofferdam
ASCE | 2021
|Construction method of underwater pile foundation steel sheet pile cofferdam
European Patent Office | 2023
|